Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation at Macraes Gold Mine

    The mining licence for the Macraes gold mine places emphasis on the progressive rehabilitation of the land to a state compatible with the landscape and environment that existed prior to mining activit

    Jan 1, 1992

  • AUSIMM
    Development of mine intelligent ventilation technology in western China

    By S G. Li

    Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with

    Oct 12, 2022

  • AUSIMM
    Risk assessment of iron mineral resources using conditional simulations

    By W Patton

    Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a

    May 24, 2023

  • AUSIMM
    Heterogeneity, Sampling Errors and the Nugget Effect in Gold Ores - Implications for Evaluation, Exploitation and Extraction

    Sampling errors result from heterogeneities within the lot under study. Within a rock mass in situ heterogeneity results in the geological nugget effect, which accounts for most of the natural variabi

    Aug 1, 2010

  • AUSIMM
    Prediction of Acid Gas Generation in the Petroleum Industry

    By M R. Asef

    Although generation of environmentally harmful hydrogen sulfide is considered to be related to sour gas fields, sweet gas reservoirs and waste fluids, travertine springs and geothermal fields may also

    Sep 26, 2011

  • AUSIMM
    Removal of Thiocyanate from Solutions by Precipitation

    Removal of Thiocyanate from Solutions by Precipitation

    Sep 13, 2010

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    A review of ventilation and gas management in underground mines

    By A Self, B Robertson

    During 2015 and 2016, the authors conducted a number of surveys, workshops and reviews of ventilation and gas management practices in Australian underground coalmines. The study was funded by ACARP wi

    Aug 28, 2017

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Predictive maintenance modelling for bearing-based equipment

    By Y Xie, D Willingham

    Predictive maintenance (also known as ‘condition/health monitoring’) refers to the intelligent monitoring of equipment to avoid future failures. In contrast to conventional preventive maintenance, the

    Jul 24, 2017

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Effect of mud farming on the dewatering of bauxite residue

    By D J. Williams, C Zhang, F E. Herrera Cabrera

    Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc

    Jul 1, 2021

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Education and the Role of Geotechnical Professionals in the Mining Industry

    The Australian mining industry faces skills shortages across a broad spectrum of disciplines and levels, as it enters another major growth phase. Critical amongst the areas of most significant shortag

    Nov 25, 2010

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    Use of Isanol in Production Blasting at ISA Mine

    By Bradford NL

    The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies be

    Jan 1, 1985

  • AUSIMM
    Coalbed Methane Opportunities in New Zealand: Similarities With the Powder River Basin Coalbed Methane Paradigm

    By D A. Manhire, R M. Flores

    The commercial develop of coalbed methane from the Powder River Basin has demonstrated that low-rank coals can be a viable source of gas. Currently over 20 000 coalbed methane wells exist in the Powde

    Jan 1, 2002

  • AUSIMM
    Gold Mineralisation at the Porgera Gold Mine, Papua New Guinea, in Response to Fluid Mixing

    By C A. Heinrich, J L. Walshe, V J. Wall

    The Porgera Gold Mine, located in the highlands of Papua New Guinea, has produced over 5 million ounces of Au, since its opening in late 1990. The deposit is located within Upper Cretaceous Papuan Pla

    Jan 1, 1995

  • AUSIMM
    Re-Opening the Bullendale Mine

    Aurum Reef Resources is a provincially owned unlisted public company which holds a number of prospecting licences over Otago hard rock historically active minesites. The Bullendale Licence 31 1845 was

    Jan 1, 1992