Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dynamic Simulation in Iron Ore Pelletising PlantsBy P Navarra, R Kuhne
Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden
Jan 1, 2009
-
Inferred Mineral Resources and Gold Veins - Discussion and Case StudiesClassification within the Inferred Resource category is based on geological judgement and the balance of extrapolation versus interpolation that the Competent Person is prepared to accept. These resou
Jan 1, 2006
-
Microsilica 600 - A Natural Amorphous SilicaBy K Thorpe
Amorphous silica deposits have been identified at Tikitere and Taheke near Rotorua. Two areas at Tikitere have been surface sampled and drilled to establish a resource of amorphous silica in excess of
Jan 1, 1999
-
Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project ValueBy P Myers, T Elkington, S Wonday
Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S
May 24, 2012
-
The Composition of the Peko Copper Orebody, Tennant CreekThe Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.
Jan 1, 1955
-
Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche CavernsBy N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo
This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut
Sep 17, 2014
-
Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest AustraliaBy E J. B van Etten
Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys
Oct 5, 2011
-
The Changing Role of Representative Bodies and InstitutesChange is inevitable but learning from change is an option. Willingness to learn is one of the first lessons that a leader must learn. Get comfortable and get left behind. I propose to outline the mai
Jan 1, 2000
-
Preconcentration in the pit – size mattersBy T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
Study on Mineral Processing Technology for a Refractory Iron OreStudy on Mineral Processing Technology for a Refractory Iron Ore
Sep 13, 2010
-
Dilution, Ore Grade and Blast Movement Calculation ModelBy I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite
This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope
Aug 24, 2015
-
The Economic Effect of Greenhouse Policies in New ZealandNew ZealandÆs share of global greenhouse gas emissions, at about one fifth of one per cent, is very small. But the profile of those emissions is unique among OECD countries; more than half come from m
Jan 1, 2002
-
Application of Genetic Algorithms for Reliability Assessment of Two Mine Hoisting SystemsThis paper discusses the application of a computerised model based on genetic algorithms (GAs), called GenRel, for reliability assessment of underground mine hoisting systems. The purpose of this pape
Dec 6, 2010
-
The Role of Geotechnical Investigations in Increasing Coal Recovery RatesIt has been thought in the past that New Zealand had ample coal reserves, able to provide fossil fuel supplies well into the future. Such is not the case and every effort must be made to achieve the h
Jan 1, 1976
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Decoupling the pulp and froth effect of ultrafine particles on Itabirite iron ore flotationBy B McFadzean, N P. Lima, D A. Deglon
The reverse flotation of Itabirite iron ore is typically performed after a desliming step in which most of the sub-10 µm particles are removed. This is done to limit processing problems such as poor f
Aug 24, 2022
-
Direct observation of the fayalite slag formation behaviour from large SiO2 grainsBy S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami
The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea
Jun 19, 2024
-
Open Pit Mine Slope Engineering: A 2002 PerspectiveIn most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre
Jan 1, 2002
-
The Relationship Between the Crown Minerals Act 1991 and the Resource Management Act 1991, a Legal PerspectiveOn the first of October 1991 two significant pieces of legislation came into force. Both of these are relevant to the allocation and use of minerals in New Zealand . They are th
Jan 1, 1992
-