Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The potential of 4IR technologies to mitigate risk in mine residue management
By C. Bester, G. M. Rohde
A major challenge in the mining sector is the responsible management and efficient storage of mine residue. Over recent years numerous tailings dams have experienced unintended spills and failures, wi
May 27, 2025
-
Maximizing The Recovery Of Fine Iron Ore Using Magnetic Separation - Synopsis
By M. Dworzanowski
The beneficiation of fine iron ore will increase in importance in the future because most new iron ore resources will be in the form of lower grade ore deposits that will require liberation of iron or
Jan 1, 2012
-
Further Processing And Granulation Of Slags With Entrained Metal And High Metal Compound Content, With Specific Reference To Present Manganese Slag Dumps As Well As Additions Due To Daily Production
By D. Norval
Keywords: Pyrometallurgy, slag, metal, entrained, granulation, ferromanganese Water granulation of certain slags with high metal entrainment has customarily not been practised, not only due to the
Jan 1, 2011
-
Rapid Sensors For Ferroalloy Production And Processing
By A. McLean, M. Iwase, K. Wakimoto, K. Katogi
For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam
Jan 1, 2004
-
Identification of Key Performance Areas in the Southern African Surface Mining Delivery Environment
By A. W. Dougall, T. M. Mmola
"SynopsisThe global resources and commodities market has become highly competitive. While southern Africa’s abundance of minerals resources is still unrivalled, it has lost considerable dominance in t
Jan 1, 2015
-
A Modified Model to Calculate the Size of the Crushed Zone around a Blast-Hole
By Z. Leng
"After detonation of the explosive, the final blast-induced damage area around the blast-hole falls into three categories, namely crushed zone, fractured zone, and elastic deformation zone. This paper
Jan 1, 2016
-
Pelletizing Of Sishen Concentrate - Synopsis
By P. Mbele
Iron ore concentrate is not easily transported to, or processed in, ironmaking plants, therefore it is necessary to agglomerate. This paper will determine the possibility of agglomerating Sishen conce
Jan 1, 2012
-
The Evolution Of Strategic Long-Term Planning At Anglo Platinum
By D. C. Andersen, G. L. Smith, J. Pearson-Taylor
Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri
Jan 1, 2006
-
Outotec Direct Leaching Application In China
Outotec?s direct leaching process is an atmospheric leaching process for sulphidic zinc concentrates. The direct leaching process, based on special leaching reactors developed by Outokumpu, is the mos
Jan 1, 2008
-
Silicon Processing: From Quartz To Crystalline Silicon Solar Cells
By B. S. Xakalashe
Keywords: Pyrometallurgy, silicon, solar cells Silicon has been the dominant material in the photovoltaic (PV) industry since its application in the space industry in 1958. This review focuses on
Jan 1, 2011
-
Optimization of coal mine parameters to provide safe operation
By A. M. Bryukhanov, A. G. Mnukhin
The report states accident rates for gassy/dusty coal mines represented as an ergatic system "man – machine - environment" with further analysis by the method of conditional probabilities. A coal
Jan 1, 2003
-
Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction
By Jeremy Bosman, Johan de Korte
Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f
Jan 1, 2006
-
Simulation of integrated underground mining-processing
The paper examines the design issues associated with the integration of mineral processing within underground mining systems. It demonstrates conceptual integrated system design options appropriate to
Jan 1, 2003
-
TEM Study Of Solid Titanium Oxides Inclusions In Steel Melt At 1600°C
By C. -T. Mutale, A. S. Tuling
Titanium can exist in three different oxidation states. Its oxides are numerous and in presence of iron and oxygen, iron-titanium oxide compounds can also form. Some of the oxides are non-stoichiometr
Jan 1, 2004
-
Measurement of induced stress under high rock stress by compact conical-ended borehole overcoring technique
By K. Sugawara, H. -S. Jeong, Y. Ishiguro, J. Otani, Y. Obara, A. Hirata
A series of measurements of induced stress by the Compact Conical-ended Borehole Overcoring (CCBO) technique was performed within rock mass around a tunnel excavated in a region that an underground po
Jan 1, 2003
-
Laser Surface Deposition of Niobium and Titanium-Niobium on Ti6a14V Substrates for Biomedical Applications
By N. Baloyi, P. Popoola, M. Tlotleng, S. L. Pityana
"The advantages of using Nb and Ti-Nb coatings for improving the hardness and corrosion resistance of Ti6Al4V were investigated. It has been reported that Ti6Al4V used in orthopaedic implants tends to
Apr 1, 2019
-
Mine seismicity: prediction or forecasting? - Synopsis
By S. M. Spottiswoode
Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a sma
Jan 1, 2010
-
Strategic Long Term Planning In Mining ? Synopsis (287252bf-313f-4c0f-98fd-28fa4c30c9b7)
By G. L. Smith
The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom
Jan 1, 2012
-
Strategic Long Term Planning In Mining - Synopsis
By G. L. Smith
The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom
Jan 1, 2012
-
An Investigation Into The Optimization Of Personnel Transportation To Level 15 And Below At Khuseleka No. 1 Shaft, Anglo Platinum ? Synopsis
By M. S. P. Rampedi
The paper reports on a vacation work project conducted at Khuseleka No. 1 Shaft, Anglo Platinum, where there was a need to optimize the transport of personnel to level 15 and below. Approximately 900
Jan 1, 2012