Session 20 "Grouting for Water Retaining Embankments"
By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Analysis Of Driving Stress Measured In The RC Long Pile
By Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991
-
OPA Contender Features Innovative ACIP Pile Test
By Andres M. Baquerizo, Matthew E. Meyer, Carlos Ortiz
"The Metropolitan Miami development, a downtown mixed-use complex developed by Miami-based MDM Development Group, has weathered the economic downturn by adapting to the needs and pressures of the loca
Jan 1, 2012
-
Outline and Execution Control System of Dry Jet Mixing (DJM) Method
By Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
State of the Art Ground Improvement Technique for a Residential Complex: Case Study
By Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
Micropiles for Seismic Retrofits
By Rob Jameson
"Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar
Jan 1, 2009
-
Behavior Of Large Bored Piles With Grouted End
By Zhang Yaonian
This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati
Jan 1, 2004
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY
By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Risks Associated With Finite Element Modelling Of Cut And Cover Structures
By Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Hudson’s Revitalization: The Use of Robotics in the Work Place
By Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches
By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
Automated Pile Load Test Monitoring
By Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)
By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Collaborative Development of Sustainable & Economical Solutions for Underground Structures
By Abid Adekunte
"Whilst safety is considered to be of high priority in every aspect of engineering projects, it is equally important for designers and contractors to be continually aware of their obligations to the i
Jan 1, 2017
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain Geology
By Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
A Numerical Study On Behavior Characteristics Of Steel-Concrete Composite Drilled Shafts
By Hyu-Soung Shin
This study is concerned with the characteristics of the behavior of steel-concrete composite drilled shafts, a material that is used for large bridge foundations, and especially for weak submerged gro
Jan 1, 2007
-
A Seepage Control Cutoff in an Extreme Saline Environment
By Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy
"Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture
Jan 1, 2016
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa
By Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground Conditions
By Emad Farouz, Francis A. Abreu
"This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla
Jan 1, 2017
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology
By A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019