Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1

    By EFFC/DFI Concrete Task Group

    Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif

    Jan 1, 2016

  • DFI
    Geo-Foundations Project Information Management Systems on a Budget

    By Jamey B. Rosen

    As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech

    Jan 1, 2019

  • DFI
  • DFI
  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
  • DFI
    Building The High-Pressure Jet-Grouting Curtains For Deep Foundation Ditch In The Seaside Area

    By Lin Daoyi

    In this paper, we have adopted the high pressure jet-grouting curtains to seal the sea-water, and to consolidate the wall of the well for deep foundation diteh, make a pladge of building and construct

    Jan 1, 1991

  • DFI
  • DFI
    Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural Support

    By Donald Bruce

    The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
  • DFI
    Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and Micropiles

    By Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen

    "This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build

    Jan 1, 2017

  • DFI
  • DFI
    Bearing Capacity Of Piles In Soils With Time Dependent Characteristics

    By M. J. Preim

    Two case histories are presented on the evaluation of static bearing capacity of piles driven in soils that exhibit time dependent strength changes. Under consideration are a steel and a concrete pile

    Jan 1, 1989

  • DFI
  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996