Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story Structure
By Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer Platform
By Brian T. Nereson, Michael C. Penney
"This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm
Jan 1, 2016
-
Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, Missouri
By Adrian M. Keller
Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer
Jan 1, 2010
-
Session 29 "Grouting for Tunnels 1"
By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure
By Denis Huber
The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation
Jan 1, 2002
-
Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment
By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur
There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri
Jan 1, 2019
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin
By J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology
By Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Static Behavior of Steel H-Piles under Axial Load using Scale Models in Very Soft Clays
By Francisco A. Flores, Rigoberto Torres
The Complementary Technical Standards of Mexico’s City Building Code do not mention the criteria to compute the bearing capacity of Steel H-piles. It is necessary to increase knowledge in using steel
Sep 8, 2021
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai
By Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
3D FEM Modelling of a Ground Improvement Solution
By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)
By Peter Deming
"PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,
Jan 1, 2006
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction
By Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
Eglinton Crosstown - Over and Under the Existing Subway
By Shawna Munn, Sarah Speir
Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission
Jan 1, 2023
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)
By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)
By Nabil F. Ismael
"Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T
Jan 1, 2017
-
Post-Katrina Emergency Interim Flood Protection
By Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine
By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Experimental Investigation on the Lateral Load Capacity of Monopiles in Dense Sand
By Kenneth Gavin, Weichao Li, Paul Doherty
"The lateral load capacity is one of the most important issues to be considered in designing piles to resist berthing loads, ship impact forces and for monopiles used in the offshore wind sector. A nu
Jan 1, 2015
-
A Study Of Aspects Of The Historical Development Of Geotechnical Engineering
By Thomas J. Kennedy, Michael D. Bennett
The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c
Oct 1, 2022