    An Unusally High Thermal Efficiency Power Plant for the Cantung Mine

    By C S. Walker

    This paper analyzes the physical, operational and economic site conditions which were conducive to the design of a diesel-electric power plant wherein the over-all use of the thermal energy of the fue

    Jan 1, 1965

  • CIM
    Pulp-Lifter flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale Mills

    By Raj Rajamani

    In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport of

    Jan 1, 2012

  • CIM
    Narrow Vein Stoping at No. 2 Mine, Central Patricia Gold Mines, Limited

    By J. R. MacDonald

    MINING literature contains very few descriptions of operations producing as little as 25 to 30 tons of ore per day. The purpose of this paper is to discuss the gradual development of a mining method f

    Jan 1, 1941

  • CIM
    OsEIP: The Oil Sands – Equipment Interactions Program

    By T. G. Joseph

    "The Oil sands-Equipment Interactions Program (OsEIP) is a collaborative research venture between Syncrude Canada Ltd., James Progithin International Ltd. (JPi), the University of Alberta, P&H MinePro

    Jan 1, 2002

  • CIM
    Iron Control in High?Concentration Chloride Leaching Processes

    By G. B. Harris

    In recent years, increasing attention has been focused on the hydrometallurgical treatment of base metals feeds, especially nickel laterites and polymetallic sulphides. One approach that has received

    Jan 1, 2006

  • CIM
    Sélection optimale des quantités d'explosifs basée sur des contraintes de production et un résultat d'analyse de régression multiple

    By J. L. Collins

    "Une recherche debutee en 1987 tente de cerner divers éléments ayant un impact sur la productivite miniére, de facon à améliorer la planification des operations souterraines. II a été possible de recu

    Jan 1, 1990

  • CIM
    Modelling of Emissions from Electric Arc Furnaces

    By Viraj Parekh, Kinnor Chattopadhyay, Sina Mostaghel, Xiao Zhang

    Electric arc furnace steelmaking is a dominant approach in North America and controlling EAF emissions is a key issue today because of stringent permit limits imposed by various regulatory bodies. In

    Jan 1, 2015

  • CIM
    Discrete Event Simulation of the Glencore Sudbury Integrated Nickel Operations Converter Aisle

    By G. Goodall, M. Muinonen, R. Pandher, R. Jabbar, S. J. Muinonen

    "The implementation of a new and highly efficient converting practice at the Glencore Sudbury Integrated Nickel Operations Smelter has opened the possibility to further capacity increases by using lar

    Jan 1, 2017

  • CIM
    A Petrochemical Study of the Abitibi Volcanic Belt and Its Bearing on the Occurrences of Massive Sulphide Ores

    By Descarreaux. Jean

    "The Abitibi volcanic belt was sampled along a cross section extending from Matagami to a point east of Rouyn. A few samples were also collected in Louvicourt township, Quebec. The major elements were

    Jan 1, 1973

  • CIM
    Mining Industry-Specific Institution Building for Environmental Reporting

    By Knud Sinding

    Environmental reporting by mining firms takes many forms and change frequently. The objective of these reports is related to increasing the legitimacy of mining firms with their diverse stakeholders.

    May 1, 2002

  • CIM
    The Briquetting of Alberta Coals

    By W. A. Lang

    "I.-IntroductionAn attempt bas been made in this paper to provide a basis for appraisal of the future of the coal briquetting industry in Alberta by outlining the processes used for briquetting variou

    Jan 1, 1950

  • CIM
    Agglomeration of Superfine Fly Ash in High Velocity Gas Streams

    By G. K. Lee, E. R. Mitchell

    Designers of combustion processes may select aerodynamic conditions which produce only superfine fly ash. Although it is not usually anticipated that this will create a problem, such as has been found

    Jan 1, 1962

  • CIM
    Ontario?s Experimental Plant for Resource Recovery

    By B. I. Boyko

    As part of the Ministry of the Environment's Resource Recovery Program, the Province of Ontario has constructed a $13 million "Experimental Plant for Resource Recovery" in Metropolitan Toronto. T

    Jan 1, 1978

  • CIM
    Metallogenic overview of the Nain Province, northern Labrador

    By Derek H. C. Wilton

    "The Nain Province (NP) of northern Labrador is a >600 km long by =100 km wide Archean craton that has undergone relatively little mineral exploration until economically signifcant concentrations of o

    Jan 1, 1996

  • CIM
    Production Methods in the Turner Valley Field

    By S. G. Coultis

    Turner Valley is in the foothills of the Rocky mountains, at an altitude of 4,000 feet, and is 42 miles south west of Calgary. The present producing area is 8 miles long by 1 1/2 miles wide, while dri

    Jan 1, 1929

  • CIM
    Mine safety

    By N. J. Duncan

    "Coal mining, whether surface or underground, has hazards that make it unique in the field of industrial safety and health. The often soft, faulted and folded sedimentary strata make wall or roof move

    Jan 1, 1985

  • CIM
    Influence of Different Organic Additives on Zinc Electrowinning from Acidic Sulphate Electrolyte

    By E. Ghali, W. Zhang, G. Gabra, N. Sorour, G. Houlachi

    The additives polyacrylamide, 1-Butyl-3-methylimidazolium chloride, Tetra-butylammonium bromide, Benzalkonium chloride and chitin are evaluated during zinc electrolysis from synthetic acidic sulphate

    Jan 1, 2015

  • CIM
    Evaluation of Cave-To-Mill Opportunities at the New Afton Mine

    By M. Samuels

    "Block and panel cave mining methods are being increasingly proposed as they allow massive, deeply situated ore-bodies to be mined economically at a time when discovery rates of significant near surfa

    Jan 1, 2018

  • CIM
    Comparison of Two Failure Criteria for the Assessment of Haulage Drift Stability Using Stochastic Analysis and Numerical Modelling

    By Wael Abdellah

    Mine haulage drifts are the primary access to the mining blocks of an orebody in a multilevel mining system of a tabular ore deposit. The stability and functionality of haulage drifts are thus crucial

    Jun 1, 2012

  • CIM
    Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project

    By S. A. G. Poppen, J. Konopka

    "Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.

    Jan 1, 1983