Factors Affecting Ground Support Performance in MiningBy Dugan K. J
Mine operators are currently in a situation where market forces are acting to reduce profit margins and at the same time, regulatory bodies are insisting on improved mine safety and stability. This me
Jan 1, 1992
-
Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot PlantBy Lightfoot BW, Foo KA, Conochie DS
Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important
Jan 1, 1984
-
Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken HillBy de Bruin J H
A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan
Jan 1, 1993
-
The Selective Ion Flotation of Gold Cyanide from a Heap Leach Mine Feed LiquorBy Nicol SK, Engel MD
Ion flotation involves the adsorption of ionic species, in association with surfactant molecules, at the surface of rising gas bubbles, for the purpose of recovering and concentrating those ions. Th
Jan 1, 1993
-
Depositional Evolution of the Devonian-Carboniferous Intracratonic Burdekin Basin, North QueenslandBy Draper J. J, Jell J. S
The Burdekin Basin in the Townsville hinterland is an intracratonic extensional basin which contains up to 4500 m of marine and continental siliciclastics and carbonates. The basin sequence is recogni
Jan 1, 1990
-
Housekeeping in the Tankhouse and Remodelling of the Casting Department in the Electrolytic Zinc PlantThe tankhouse of the electrolytic zinc plant at Nordenham is operating with a very high operating efficiency of 99 per cent. This has been achieved not only by strict control of the quality of the z
Jan 1, 1993
-
Drainage Research at Mount Isa Mines Limited 1992 - 1997By Chend J
Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r
Jan 1, 1998
-
Aspects of the Design and Construction of the Chong Ming Tunnel ShanghaiBy R Frew, E Wong, G Ferguson
The Chang Jiang Tunnel and Bridge Project, when completed, will provide a fixed link between ShanghaiÆs rapidly developing Pudong District and Chong Ming Island, situated in the Yangtze River delta. T
Jan 1, 2008
-
Profit and Loss - What is reasonable?A real Dorothy Dix title has been selec- ted for this paper. It has the advantage, however, of being capable of being interpreted in many different ways and hence I can select my own approach. You
Jan 1, 1975
-
A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning ProblemBy Caelli T, Robey M
Most research into planning of open pit mines has been based on evaluation of volume-element block models in terms of their net present value. The major issues revolve around two interdependent proble
Jan 1, 1996
-
The Panguna Orebody: A Case StudyBy Swain H. D, Kay R. L
Assessment of mineral reserves in any ore- body hinges on both mineralisation characteris- tics and the economics of extraction. The mineral reserves statement depends on interpre- tation of diamond d
Jan 1, 1979
-
Application of Probabilistic Seismic Hazard Analyses to Areas of Low SeismicityProbabilistic seismic hazard analyses (PSHA) have now gained wide acceptance in the development of design criteria for major projects. When used with regional criteria the procedures have also allowed
Jan 1, 1990
-
Design and Scale-Up Criteria for Column FlotationBy Mankosa MJ, Yoon R-H
A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i
Jan 1, 1993
-
A review of the AARL process for the elution of gold from activated carbonBy Schmidt CG
Parameters affecting gold elution using the AARL process are reviewed and critically analyzed in an attempt to optimise metallurgical efficiency and minimise costs in both current and future carbon
Jan 1, 1986
-
Aerodynamic Study on Raceway in Blast FurnaceBy Kurita K, Tanaka T
In order to clarify the gas flow and motion of coke and reaction in the raceway, the mathematical raceway model was developed. This model consists of the equations of momentum and continuity of gas
Jan 1, 1981
-
Selective Ion Flotation of Gold from Alkaline Cyanide SolutionsBy Leahy G. J, Moxon N. T, Nicol S. K
Experimental work is described in which extremely dilute aurocyanide liquors are treated with novel surface-active complexing agents to produce a hydrophobic aurocyanide species. Subsequent aeration
Jan 1, 1991
-
Geology, Mineralisation and Genesis of the Alkaline Dinkidi Cu-Au Porphyry, North Luzon, PhilippinesBy P Joyce, D R. Cooke
The Dinkidi Cu-Au porphyry deposit is situated in the Caraballo Range of North Luzon, Philippines. Although comparatively small, Dinkidi has unusually high gold grades with drilling by Climax-Arimco M
Jan 1, 1999
-
Portovesme KSS Lead Smelter Sets New TechnologyBy Carlini G, Ibba R
The KSS Lead Plant (Kivcet - SNAMPROGETTI - SAMIM) of Por tovesme, owned by Nuova Samim (the sector-head Company for non ferrous metals and derivatives owned by ENI), has been operating since febru
Jan 1, 1989
-
A Review of the Structure and Stratigraphy of the Central Pine Creek GeosynclineBy Ormsby W. R, Farrar L
The stratigraphy of the central Pine Creek Geosyncline has been simplified into a three-fold subdivision comprising the Batchelor, Frances Creek and Finniss River Groups. The Batchelor Group consist
Jan 1, 1994
-
Correctly Estimating Primary Airflow Requirements for Underground Metalliferous MinesBy T Nixon
A common problem for many mines is insufficient total primary airflow or insufficient airflow in the correct places as the mine changes over its life. This has a number of impacts on the business oper
Jan 1, 2008