Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Exclusion Zone Optimization: Application of New Digital Technologies Allowing Ore Production

    By Jair Alarcón, Lucas Steffen, Leopoldo Muñoz

    Flyrock is one of the most significant hazards associated with blasting in open pit mining, especially for blasting operations near communities. Flyrock can lead to severe injuries, fatalities, and pr

    Jan 21, 2025

  • ISEE
    Blasting Versus Non-blasting Related Sounds in a House Near Surface Blasting

    By Braden Lusk

    A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav

    Jan 1, 2011

  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    The Influence of Blast Fragmentation on Loadability in Sublevel Caving

    By Daniel Johansson, Markus Danielsson, Håkan Schunnesson

    In sublevel caving, blasted material flows gravitationally into the drawpoint from above in a periodical manner. This type of flow behavior entails muck pile conditions that are variable along the cou

    Jan 1, 2018

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Comparison of Recent and Past Blast Induced Pipeline Strain Responses

    By Travis A. Davidsavor, Charles Dowding, David A. Provost, Yonggang Gou

    This paper compares measured blast induced strains on operating, full scale, buried pipelines with three similar past studies. The recently performed study represents realistic and modern pipeline bla

    Feb 1, 2020

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam

    Feb 1, 2020

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    Preventing the next Terrorist Attack is a Shared Responsibility

    By Joseph Kennedy

    How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly

    Jan 1, 2010

  • ISEE
    Risk-based Explosives Safety Assessment In Switzerland And Europe

    By Andreas Bienz

    The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor

    Jan 1, 2007

  • ISEE
    Productive Partnership – Advanced Blasting Technology at Newlands Coal Mine

    By Les Willan, Chris Batten, Matt Sparkes

    In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss

    Jan 1, 2010

  • ISEE
    Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal Mine

    By Ajoy Singh

    A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex

    Jan 1, 2012

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023