Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Regional framework for gold deposits of the Odzi-Mutare-Manica greenstone belt, Zimbabwe-MozambiqueBy H. Forster, F. H. Koenemann, U. Knittel
The greenstone belt developed along the Sandawana line, an anastomosing, transcrustal shear zone. The lode gold is concentrated in veins and along brittle-ductile shear zones and other faults. Gold co
Apr 1, 1996
-
Mecanizacion del sub level caving – YauricochaBy Carlos Espinoza Zegarra
El presente trabajo describe el método de mecanización del sublevel caving realizado en la mina Yauricocha, donde se aplica a cuerpos que varían de de pequeños a medianos, irregulares o angostos a tr
Sep 12, 2005
-
Evaluation Of Pile Foundation Design Methods Using Load TestsBy SungWon Park
The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles
Jan 1, 2009
-
Iron and Steel Division - Liquid Miscibility Gap in Iron-Tin System (TN)By K. C. Mills, E. T. Turkdogan
A number of investigators1 6 have noted the presence of a liquid miscibility gap in the Fe-Sn binary system. However, the first attempt to measure the
Jan 1, 1964
-
Role of Natural Gas in the New Zealand Energy MarketNatural Gas has been available in New Zealand for twenty years. During that time the gas share of the energy market has grown and now natural gas forms a significant part of New Zealand's energy
Jan 1, 1990
-
Development of Mains in Challenging Ground ConditionsBy Kot F. v. Unrug
The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In
Jan 1, 2006
-
Paste Backfill Strength Behaviour Using Different Binding Agents and Binder CombinationsBy Philip A. Dirige
This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength
May 1, 2006
-
The autonomous rail conveyor significantly reduces ore haulage costsBy T Graham
The invention of the traditional belt and idler conveyor system is attributed to Thomas Robins in 1892. This basic concept, ubiquitous in most mining operations, has not changed markedly in 125 years
Jul 24, 2017
-
RI 5491 Refractory Properties Of Alabama Bauxitic Kaolins - SummaryBy P. G. Pigott
The lack of technical information regarding the physical characteristics of kaolins and bauxitic kaolins, rejected during the mining of bauxite near Eufaula, Ala., has retarded their commercial utiliz
Jan 1, 1959
-
RI 3464 Recent Research By The Bureau Of Mines On The Ignition Of Firedamp By Explosives ? IntroductionBy S. L. Gerhard
In the United States the performance characteristics of permissible explosives are controlled by routine tests, which include firing the explosive into a gallery filled with a methane-air mixture. The
Jan 1, 1939
-
Compensation Issues In The Third World: A Ghanaian PerspectiveBy K. W. Grubaugh
Indigenous people are nearly always affected when projects enter their territory. Crop and other asset compensation can help or undermine a project’s progress depending on the approach. When compens
Jan 1, 2002
-
Cu-Ni-PGE mineralization hosted by bonitic gabbro, central Norwegian Caledonides: character and tectonic settingBy T Grenne, R. B. Larsen
Paper presented at the conference on Economic geology in Europe and beyond II, models for mineral deposits in sedimentary basins, held in Keyworth, UK, 13-14 April 1994. Paper originally entitled: Pro
Aug 1, 1995
-
Predicting and Controlling Ground VibrationBy James W. Reil, Douglas A. Anderson
Blast vibration monitoring has generally been regarded as a necessary evil. New instrumentation and computer programs can change this. Rather than the usual trial and error methods to control vibratio
Jan 1, 1989
-
OFR-203-84 Research To Improve Health And Safety Programs In The Mining Industry - Volume IBy Louis Schaffer
The objectives of the research were to determine whether a model health and safety program could be defined in terms which would enable its application to mines of all types, and, if such a model prog
Jan 1, 1983
-
Maintenance Management: Minimizing Risk to ProfitabilityBy Paul D. Tomlingson
Modern production equipment has been designed with greater productive capacity and higher reliability to meet the rigorous operating demands of the mining industry. These improvements have also made
Jan 1, 2005
-
The Application Of Exergy Analysis To The Cooling Of A Deep UK CollieryThe extraction of minerals and coal at greater depth, employing higher-powered machinery to improve production levels, imposes an increased burden on the ability of a ventilation system to maintain an
Jan 1, 2004
-
OFR-20-81 Combined Fire/Rot Retardant Treatment For Wood Mine TimberBy Bernard Baum
Combined preservative/fire retardant systems were pressure impregnated into Douglas fir and Ponderosa pine samples and evaluated for decay, flammability, and mechanical properties. The objective of
Jan 1, 1978
-
Bearing capacity of open-cut coal-mine backfill materialsBy A. R. Naderian
Laboratory strength and deformation testing of freshly blasted sandstone and claystone overburden from Jeebropilly colliery in Queensland and in-situ plate-bearing tests on four backfills of different
Jun 19, 1905
-
The Industrial Synergy Between Mineral Sands and Saline Waters of the Murray Basin, AustraliaBy G Sparrow
The Murray Basin is being heralded as the next major mineral sands province in Australia. Already exploration programs have delineated extensive commercial deposits and several companies are progressi
Jan 1, 2001
-
Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project DescriptionBy Daniel J. Rider
In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from
Jan 1, 1987