Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Operation And Improvements On Peirce-Smith Converters At The Tamano SmelterBy S. Tanaka
The Tamano Smelter of Hibi Kyodo Smelting Co. Ltd. was commissioned in 1972. Since start up, the anode production capacity has increased from 101,000 tpy to 290,000 tpy, as a result of the applicatio
Jan 1, 2005
-
OFR-112-81 Evaluation Of Proximity Warning DevicesBy T. C. Green
A two-phase program evaluated commercial proximity warning devices and then served to design and develop an automatic electrostatic field strength measurement device with improved performance. The Pha
Jan 1, 1981
-
Behavior of Nitrogen Oxides in the Product Gases from Explosive DetonationsBy James Rowland, Marcia Harris, Richard Mainiero, Michael Sapko
All explosive materials produce a cloud of reaction products, the most toxic of which is nitrogen dioxide (NO2). In the study reported here, 4.5-kg (10-lb) charges of blasting agent confined in either
Jan 1, 2006
-
Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO BlendsBy Nick Lewis
Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F
Jan 1, 1994
-
Prediction of hydrocyclone performance using artificial neural networks - SynopsisBy M. Karimi
Artificial neural networks (ANNs) have found their applications in the modelling of unit operations of mineral processing plants. In this research, laboratory-scale tests were conducted, using a three
Jan 1, 2010
-
Strategic Long Term Planning In Mining - SynopsisBy G. L. Smith
The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom
Jan 1, 2012
-
Dust control in room-and pillar coal mining using continuous miners: Additional field evaluationsBy Y. P. Chugh
Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust
Jan 1, 2009
-
Lifting Power and Structure of Two-Phase Streams in Gravity Separation Regimes.By M. Barsky, A. Govorov, E. Barsky
A study was conducted to determine the structure and lifting capacity of a two-phase stream in a vertical pipe at different distances from the point of introduction of the material into the instrument
Jan 1, 2003
-
Reducing Overall Toxic Fumes at Fixed Work Output, by FormulatingBy Michael Wieland
For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t
Jan 1, 2006
-
Analysis Of Piles Reinforced By Jet-Grouting MethodBy JO Choi
Jet-grouting method is a useful technique to reinforce foundations on relatively soft or vulnerable soil layers such as fractured zone and stratum with cavities. Although jet-grouting has been widely
Jan 1, 2006
-
A Comparison Of Liberation Determinations By Particle Area Percentage And Exposed Particle Perimeter Percentage In A Flotation ConcentratorTo simplify programming, image analyzers commonly measure either linear intercepts or the areas of particles and grains to determine liberation based on polished section mounts. However, the concentr
Jan 1, 2002
-
Column Flotation Experience at the Sarcheshmeh Copper MineBy S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani
"The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta
Jan 1, 2000
-
Gestión de riesgosBy Juan Antonio Huamán Fernández
De acuerdo al estudio que realizó la Dirección General de Minería del Ministerio de Energía y Minas en el Perú, las estadísticas de accidentes fatales reportadas a escala nacional en el 2002 indican q
Jul 31, 2003
-
Améliorations apportées au minage de la zone 1 à la mine DoyonBy François Girard
La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo
Feb 1, 2008
-
WIPFRAG - A Breakthrough in Fragmentation MeasurementBy John A. Franklin, Tom C. Palangio, Norbert H. Maerz
No blast evaluation is complete without fragmentation measurements which until now were inaccurate, costly, time consuming and created delays in production. “WipFrag.s”is a fully automated PC based fr
Jan 1, 1995
-
Problems in Proration on the Basis of Gas EnergyBy Eugene Stephenson
CRITICAL analyses of the work expended in producing oil by the utilization of gas energy have appeared in the publications of Shaw,1 Pierce and Lewis,2 and Herold,3 authors who have ably discussed the
Jan 1, 1931
-
Noise & Hearing Protection - Development Of Two Training Exercises For DrillersBy Edward A. Barrett, Roberta A. Calhoun
MORE THAN 30 MILLION EMPLOYEES each year are exposed to hazardous occupational noise, and approximately one-third of them develop permanent hearing loss (NSC, 2000). Possible explanations for the latt
-
Sustainable Mineral Development: Possibilities and Pitfalls illustrated by the Rise and Fall of Dutch Mineral Planning GuidanceBy M. J. van der Meulen
"The Netherlands has major resources of sand, gravel and clay, exploited mainly for construction works and the building materials industry. As in most western countries, mineral extraction meets with
Jan 1, 2005
-
OFR-3(2)-81 Oil Shale Mining Environmental Research Program Plan - Mid Funding Level - V. IIBy F. G. Scott
This document is a proposed program plan for mining environmental research to be conducted by the U.S. Bureau of Mines in support of industrial oil shale mining and processing. This program plan is on
Jan 1, 1980
-
Defective Piles In Clay - SynopsisBy S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996