Search Documents

  • TMS
    Operation And Improvements On Peirce-Smith Converters At The Tamano Smelter

    By S. Tanaka

    The Tamano Smelter of Hibi Kyodo Smelting Co. Ltd. was commissioned in 1972. Since start up, the anode production capacity has increased from 101,000 tpy to 290,000 tpy, as a result of the applicatio

    Jan 1, 2005

  • NIOSH
    OFR-112-81 Evaluation Of Proximity Warning Devices

    By T. C. Green

    A two-phase program evaluated commercial proximity warning devices and then served to design and develop an automatic electrostatic field strength measurement device with improved performance. The Pha

    Jan 1, 1981

  • ISEE
    Behavior of Nitrogen Oxides in the Product Gases from Explosive Detonations

    By James Rowland, Marcia Harris, Richard Mainiero, Michael Sapko

    All explosive materials produce a cloud of reaction products, the most toxic of which is nitrogen dioxide (NO2). In the study reported here, 4.5-kg (10-lb) charges of blasting agent confined in either

    Jan 1, 2006

  • ISEE
    Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO Blends

    By Nick Lewis

    Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F

    Jan 1, 1994

  • SAIMM
    Prediction of hydrocyclone performance using artificial neural networks - Synopsis

    By M. Karimi

    Artificial neural networks (ANNs) have found their applications in the modelling of unit operations of mineral processing plants. In this research, laboratory-scale tests were conducted, using a three

    Jan 1, 2010

  • SAIMM
    Strategic Long Term Planning In Mining - Synopsis

    By G. L. Smith

    The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom

    Jan 1, 2012

  • SME
    Dust control in room-and pillar coal mining using continuous miners: Additional field evaluations

    By Y. P. Chugh

    Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust

    Jan 1, 2009

  • IMPC
    Lifting Power and Structure of Two-Phase Streams in Gravity Separation Regimes.

    By M. Barsky, A. Govorov, E. Barsky

    A study was conducted to determine the structure and lifting capacity of a two-phase stream in a vertical pipe at different distances from the point of introduction of the material into the instrument

    Jan 1, 2003

  • ISEE
    Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating

    By Michael Wieland

    For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t

    Jan 1, 2006

  • DFI
    Analysis Of Piles Reinforced By Jet-Grouting Method

    By JO Choi

    Jet-grouting method is a useful technique to reinforce foundations on relatively soft or vulnerable soil layers such as fractured zone and stratum with cavities. Although jet-grouting has been widely

    Jan 1, 2006

  • SME
    A Comparison Of Liberation Determinations By Particle Area Percentage And Exposed Particle Perimeter Percentage In A Flotation Concentrator

    To simplify programming, image analyzers commonly measure either linear intercepts or the areas of particles and grains to determine liberation based on polished section mounts. However, the concentr

    Jan 1, 2002

  • CIM
    Column Flotation Experience at the Sarcheshmeh Copper Mine

    By S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani

    "The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta

    Jan 1, 2000

  • IIMP
    Gestión de riesgos

    By Juan Antonio Huamán Fernández

    De acuerdo al estudio que realizó la Dirección General de Minería del Ministerio de Energía y Minas en el Perú, las estadísticas de accidentes fatales reportadas a escala nacional en el 2002 indican q

    Jul 31, 2003

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • ISEE
    WIPFRAG - A Breakthrough in Fragmentation Measurement

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    No blast evaluation is complete without fragmentation measurements which until now were inaccurate, costly, time consuming and created delays in production. “WipFrag.s”is a fully automated PC based fr

    Jan 1, 1995

  • AIME
    Problems in Proration on the Basis of Gas Energy

    By Eugene Stephenson

    CRITICAL analyses of the work expended in producing oil by the utilization of gas energy have appeared in the publications of Shaw,1 Pierce and Lewis,2 and Herold,3 authors who have ably discussed the

    Jan 1, 1931

  • NIOSH
    Noise & Hearing Protection - Development Of Two Training Exercises For Drillers

    By Edward A. Barrett, Roberta A. Calhoun

    MORE THAN 30 MILLION EMPLOYEES each year are exposed to hazardous occupational noise, and approximately one-third of them develop permanent hearing loss (NSC, 2000). Possible explanations for the latt

  • SME
    Sustainable Mineral Development: Possibilities and Pitfalls illustrated by the Rise and Fall of Dutch Mineral Planning Guidance

    By M. J. van der Meulen

    "The Netherlands has major resources of sand, gravel and clay, exploited mainly for construction works and the building materials industry. As in most western countries, mineral extraction meets with

    Jan 1, 2005

  • NIOSH
    OFR-3(2)-81 Oil Shale Mining Environmental Research Program Plan - Mid Funding Level - V. II

    By F. G. Scott

    This document is a proposed program plan for mining environmental research to be conducted by the U.S. Bureau of Mines in support of industrial oil shale mining and processing. This program plan is on

    Jan 1, 1980

  • DFI
    Defective Piles In Clay - Synopsis

    By S. Narasimha Rao

    Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin

    Jan 1, 1996