Search Documents

  • NIOSH
    IC 8218 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1962 (18be8f2b-3658-47c1-8502-b22edae03b6d)

    The principle activities of the Explosives Research Laboratory from July 1, 1961 to June 30, 1962, are described briefly in part 1. Part 2 gives short abstracts of publications that appeared during

    Jan 1, 1964

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • SME
    Development Of High-Efficiency Hydraulic Separators

    By Karen Mikkola, Gerald Luttrell, Jaisen Kohmuench, Glen Oswald, Michael Mankosa, Tracy Westerfield

    Hydraulic separators are commonly used for particle size classification and gravity concentration of minerals and coal. Unfortunately, the efficiency of these processes can be quite low due to poor eq

    Jan 1, 2005

  • DFI
    Predicting The End Bearing Capacity Of Rock Socketed Shafts

    By Lianyang Zhang

    For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o

    Jan 1, 2008

  • SAIMM
    Continuous Casting Mould Powder And Casting Process Interaction: Why Powders Do Not Always Work As Expected

    By A. Normanton, B. Harris, V. Ludlow, S. Riaz

    Why does a continuous casting mould powder, which works successfully on a particular caster with respect to semi quality, fail to perform on a caster of a similar design utilizing liquid steel from a

    Jan 1, 2004

  • AUSIMM
    Present Status of Remediation of Mt Lyell Acid Drainage

    By N Clarke, R Dineen, W Jones

    The Mt Lyell copper mine in western Tasmania has discharged acid drainage (AD) into the Queen and King Rivers and Macquarie Harbour for over a century. Presently, dissolved copper loads of about 1000

    Jan 1, 2003

  • SME
    Strong reserve bases are key to oil companies surviving over the long-term

    By Wilfred P. Schmoe

    Introduction An integrated oil company has two options in approaching strategic planning. It has to decide whether it is in business for the long-term. I state this in all seriousness. Those who help

    Jan 6, 1985

  • SME-ICGCM
    Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)

    By Swapan Bhattacharya

    United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr

    Jan 1, 1984

  • SME
    Sights and Sounds of the Second Mexican Mining Rail Excursion

    By Beth Robinson

    This first of two articles on the Second Mexican Mining Rail Excursion describes some of the more casual experiences participants enjoyed on last fall’s rail tour of major Mexican mining operations. I

    Jan 1, 1982

  • SME-ICGCM
    Numerical Simulation of Reinforced Concrete Mine Seal Subjected to Explosion Loading

    By Khaled Morsy

    The tragic incidents at Sago and Darby coal mines in 2006 pointed out the need for stronger seals to resist the blast effects of violent gob explosions. Mine Safety and Health Administration (MSHA) ha

    Jan 1, 2008

  • NIOSH
    A Comparative Evaluation Of The Differential-Pressure-Based Respirable Dust Dosimeter With The Personal Gravimetric Respirable Dust Sampler In Underground Coal Mines

    By R. V. Ramani, J. M. Mutmansky, P. C. Luna, V. A. Marple, Honglin He, B. A. Olson

    The development of a sampling instrument for the assessment of an underground coal miner’s exposure to airborne respirable coal mine dust on a continuous and real-time basis has been long identified a

  • IMPC
    The Development of a New Air Jig for Dry Coal Benefication

    By Hermann Wotruba, Lars Weitkämper

    "Dry coal dressing was popular during the 1950’s and 60’s in many parts of the world. The devices mainly used were air jigs and air tables.The increase in ash and moisture content of run-of-mine coals

    Jan 1, 2003

  • NIOSH
    OFR-57-75 A Computer-Controlled Electrical Resistance Network Analog For Rational Mine Design ? Summary

    By S. L. Crouch

    An important class of mining problems involves excavations in planar seam or vein-type deposits. In many instances it can be assumed that the seam is at 'infinite' depth in a homogeneous, is

    Jan 1, 1974

  • NIOSH
    RI 9105 - Fumes From Shielded Metal Arc Welding Electrodes

    By J. F. McIlwain

    The Bureau of Mines has investigated fumes generated by selected welding electrodes used in mines in order to help determine their relative health hazard potential. Fumes were generated and collected

    Jan 1, 1987

  • AUSIMM
    Analysis and Modelling of the Fragmentation Process – Case Studies at El Teniente Mine

    By V Barrera, A Brzovic, M Gaete, L Burgos, E Arancibia

    Fragmentation is one of the most relevant parameters in the design and operation of a mine using the caving mining method. Fragmentation affects all subsequent operations, including extraction, commin

    May 9, 2016

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems Part 2: Safety Considerations

    By Larry Schneider

    "0 ne of the incentives that led to the development of non-electric shock tube initiation systems was the desire within the industry to improve detonator safety. And to the extent that nonelectric ini

    Jan 1, 1995

  • AIME
    Rate Of Precipitation Of Nickel Silicide And Cobalt Silicide In The Hardenable Copper-Nickel-Silicon And Copper-Cobalt-Silicon Alloys

    By Curtis Wilson

    FROM the results of his investigation of the hardenable copper-nickel-silicon and copper-cobalt-silicon alloys, M. G. Corson1 explained the dispersion-hardening effect by assuming the precipitation of

    Jan 1, 1933

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991