Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
OFR-17(2)-77 Conceptual Design Of An Automated Longwall Mining System - Phase II - State Of The Art SurveyTo develop a conceptual design for an automated longwall mining system, one should know what has been done, what is being done today and what is being planned for tomorrow. The bibliography referenced
Jan 1, 1975
-
Metals, Research, and ProgressBy Paul. D. Merica
I LIKE to look upon the award this year also as a recognition of the importance of metallic materials of construction to the engineer and of the active progress which I believe is continually being ma
Jan 1, 1938
-
The real costs of lubricationBy R. Melley, P. Wissner
The paper looks at the basic theory of tri-bological wear and the role played by the lubricant and its additives. It presents the argument that the “real cost of lubrication” is not the purchase price
Jan 1, 1997
-
Vision And Human Engineering - How They Enter Into The Day's WorkBy Eugene McAuliffe
In the year 1581, the counselors of King Philip of Spain suggested to that monarch that a canal across the Isthmus of Darien would open the west coast of the South American continent to Spanish miners
Jan 1, 1932
-
On the Inorganic Origin of the Hydro-CarbonsBy Jacob W. Young
A casual reading of the geological literature extant to-day would give one the impression that carbon is an element which by some chance or another always existed at or near the surface of the earth,
Jan 1, 1925
-
Underground Application of Ultra-Wideband Radio for Robust Positioning and CommunicationBy S. Schade, G. Möllemann, C. Niestroj
"Mining environments, whether open-pit or underground, pose difficult conditions for any sensor system. However, the ever-increasing need for automation requires the application and use of sensor syst
Jan 1, 2017
-
Los depósitos de sulfuros masivos vulcanogénicos (VMS) de la cuenca Lancones Piura – PerúBy Alberto Ríos Carranza
El presente texto describe la evolución de la cuenca Lancones (Piura) y sus estilos de mineralización en la búsqueda de yacimientos vulcogénicos de sulfuros masivos. Dada las características de la c
May 1, 2016
-
US And International Valuation Standards – The FutureBy T. R. Ellis
Considerable movement is afoot internationally to rationalize standards and regulations relating to valuations and the qualifications for valuation professionals. In July 2000 the International Valuat
Jan 1, 2001
-
Geological Mapping into the 21st Century: QMAP and GISBy I M. Turnbull
QMAP (the Quarter Million Mapping Programme, 1:250 000 scale) is a geological mapping programme which will build a digital geological database of the whole country and publish maps and books to docume
Jan 1, 1997
-
OFR-25(1)-83 Monitoring And Modeling Of Shallow Ground Water Systems In The Powder River BasinBy Donald Koch
The project investigated regional impacts of mining on the ground water system of the Powder River Basin by: 1) establishment of a regional ground water monitoring network, and 2)development of , set
Jan 1, 1982
-
Minerals In Man's FutureBy Zay Jeffries
From the title of this chapter the reader could expect an attempt to outline the anticipated shape of things to come, mineralwise. We have no crystal ball and if we possessed one we could claim no exp
Jan 1, 1959
-
Metallurgical Control ù Case StudiesBy Y Yang
This paper discusses various issues surrounding the metallurgical control for furnaces, especially focusing on processes with long time-constants and æmetallurgical memoriesÆ. Examples will focus on f
Jan 1, 2000
-
OFR-10-70 Underground Coal Mining In The United States - 1. Purpose Of StudyThe purpose of this study was to examine the problems of underground coal mining in the United States, and to develop recommendations for an integrated Research and Development Program aimed at resolv
Jan 1, 1970
-
The Benefits and Challenges of “Split Milling” at the Williams MillBy Glenn Norris, Tyler Buckingham
"Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini
Jan 1, 2010
-
Utilización de imágenes Landsat TM en la caracterización de macizos rocososBy María del Rosario González Moradas
El presente texto describe diversas técnicas de teledección como métodos para determinar alguna de las variables utilizadas desde el punto de vista geotécnico y que permiten una clasificación de los m
May 1, 2017
-
Narrow-Vein Mining Project: Economical Realities and Innovation Perspectives for the Extraction of Narrow Vein DepositsBy Jean-Marie Fecteau
The gold mine sector is presently facing low gold prices as well as technological challenges. Its competitiveness and survival will depend on new mining methods and equipment to improve ore extraction
Oct 1, 2001
-
OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - AppendicesBy Daniel I. Carey
Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It
Jan 1, 1981
-
Prediction of Near-Field Rock Damage Due to Production Blasting in Limestone Quarries, JapanThis paper presents the near-field rock damage owing to production blasting in limestone quarry in the western region of Japan. The study's purpose is to learn the mechanism of crack development
Dec 6, 2010
-
Construction of Free Faces in a Single EventBy Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra
Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro
Jan 26, 2026