Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dimensioning of Tunnels in Swelling RockBy P. Wittke-Gatterman
ABSTRACT: A three dimensional constitutive law for swelling rock is presented. It can be applied to the osmotic swelling of mudstone as well as to the swelling of rocks containing anhydrite. It descri
Jan 1, 2003
-
Applying tracer gas techniques to evaluate the air distribution in flood leaching stopesBy A. Sheikh, S. Hardcastle
"Various methods of leaching are being used by Denison Mines Ltd. Uranium Operations. This study was designed to investigate the flood leaching operation of two parallel inter-connected stopes contain
Jan 1, 1988
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - SummaryBy Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines LimitedThe ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine
Jan 1, 1968
-
Understanding heavy mineral separation duties using finite element analysis - SynopsisHeavy mineral deposits are becoming more complex in terms of their compositional variation, particle mineralogy and size distributions, and present challenges for the operation of separation equipment
Jan 1, 2010
-
Predicting the probability of Iron-Rich Ultramafic Pegmatite (IRUP) in the Merensky Reef at Lonmin’s Karee MineBy D. Hoffmann, S. Plumb
IRUP is an iron-rich ultramafic pegmatite rock that formed due to hot ironrich fluids and gases replacing local stratigraphic zones of the Bushveld Complex. This study focuses on the estimation of the
Jan 1, 2015
-
Assessment of surface fracture depth and intensity due to subsidence over the longwall panel using a sonic techniqueBy A. W. Khair
This paper presents an analysis of fracture depth and intensity due to subsidence over the longwall panel. Sonic reflection techniques were utilized to determine fracture depth, and a variation of p-w
Jan 1, 1989
-
Folding of the Greenland Group, Reefton GoldfieldBy M Stewart
The structural framework for the major gold deposits of the Reefton Goldfield was largely established in the 1930s after a detailed regional geological mapping programme. Recent new mapping has now su
Jan 1, 1996
-
Failure mechanisms in ultra-close seam miningBy Yingxin Zhou
Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie
Jan 1, 1989
-
The Abundances of Copper, Zinc, Lead and Silver in the Discordant Hydrothermal Orebody of the Conrad Mine, N.S.W.Copper, zinc, lead, and silver in the discordant magmatic-hydrothermal orebody of the Conrad Mine, N.S.W., all have a relatively high mean abundance. Any single concordant sulphide orebody containing
Jan 1, 1963
-
Optimizing The Life Of Ore Passes In A Deep-Level Gold MineBy P. R. Brenchley
Main ore pass systems should last the life of a mine, and too often expensive and hazardous remedial measures are required to repair a damaged ore pass in an attempt to extend its life. In order to ma
Jan 1, 2006
-
The Rate Variable Batch Test (RVBT) - A Research Method of Characterising Ore FloatabilityThe Rate Variable Batch Test (RVBT) - A Research Method of Characterising Ore Floatability
Sep 13, 2010
-
Avaliação Da Resistencia A Corrosão De Dois Aços Alto Manganês E O Aço 9% Níquel Em Solução De H2so4By Mauro Andrés Cerra Flórez
O presente estudo visa avaliar a resistência à corrosão de dois aços alto manganês com relação ao aço 9% Níquel em solução eletrólito 0,001M de H2SO4. Para esta pesquisa foram utilizados dois aços com
Oct 30, 2017
-
The Re-Engineering Of The Ground Handling System At Cullinan Diamond MineBy A. W. Bester
Paper written on project work carried out in partial fulfilment of B. Eng. (Mining Eng.) Cullinan Diamond Mine currently handles 3.2 million tons of run of ore per annum. This is done by means of a
Jan 1, 2005
-
Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal MineBy D. S. Choi
This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho
Jan 1, 1990
-
Some Aspects of Suction Dredge DesignImportant factors in dredge design are the estimation of total head, and the determination of flow in and around suction nozzles and in pipe lines. Total head for the dredge pump is calculated from ve
Jan 1, 1962
-
Mineral Exploration in South-West TasmaniaBy Spooner H. W
The paper describes the search for mineral deposits in an area of 4,500 sq. miles of south-west Tasmania. The area is one of difficult access and the problem of speedy movement and maintenance of fiel
Jan 1, 1960
-
Chambers Creek Interceptor Sewer TunnelBy J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass
The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll
Jan 1, 1985
-
Top Hammer Drilling-The Way Things WorkBy William D. Hissem
For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.
Jan 1, 1998
-
A Hybrid Location MethodologyBy S. M. Spottiswoode
The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on
Jan 1, 2005