Search Documents

  • AIME
    Minerals Beneficiation - A Modified Laboratory Flotation Cell

    By A. Raja, C. C. Harris

    Apparatus for maintaining constant — but adjustable — pulp level and rate of froth removal are described. The results of preliminary experiments into the effect of scraping speed on the rate of solid

    Jan 1, 1967

  • AUSIMM
    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Sep 13, 2010

  • SME
    Macassa Number Three Shaft Deep Shaft Sinking By Conventional Methods

    By W. M. Shaver, W. R. Dengler, F. A. Edwards

    INTRODUCTION The Macassa Division of Lac Minerals Ltd. is a high grade gold mine that has been operating in Kirkland Lake, Ontario for the past 51 years. It produces approximately 120,000 tonnes of

    Jan 1, 1985

  • AUSIMM
    Notes on Lake Margaret Hydro-Electric Power Scheme.

    LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and

    Jan 1, 1915

  • NIOSH
    OFR-19-77 Development And Design Of A Mine Roof Simulator - 0.0 Introduction - 0.1 Background

    By Klaus L. Cappel

    In 1972, the Bureau of Mines of the U. S. Department of the Interior commissioned the development and design of a Simulator for research and testing of mine roof supports used in long-wall mining. The

    Jan 1, 1974

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • SME
    Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2009

  • CIM
    X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die Casting

    By Zhuofei Yang, Jidong Kang, David S. Wilkinson

    The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The

    Jan 1, 2014

  • SME
    Though Not a Record Year, the Coal Industry Performs Well in 1983

    By L. Westerstrom

    Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th

    Jan 5, 1984

  • NIOSH
    RI 3673 Stemming in Metal Mines, Progress Report 5

    By Wing G. Agnew, John A. Johnson

    "INTRODUCTION This paper is one of a series being published by the Bureau of Mines pertaining to an investigation on the use of stemming in metal mines now being conducted at the Mount Weather Testing

    Dec 1, 1942

  • NIOSH
    OFR-60-78 Analysis Of Coal Preparation Plants For Applicability Of The National Electrical Code - Part I: Analysis And Review - Part II: Recommended Guidelines

    By S. Atallah

    A survey was conducted relating to the current practices for the classification of hazardous locations in coal preparation plants. Several plants processing bituminous, anthracite and lignite coal in

    Jan 1, 1977

  • SME
    Horizontal Geotechnical Investigations for Tunneling

    By Nick Salisbury, Alan Howard, Scott Tunison

    INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to

    Jan 1, 2005

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013

  • AIME
    On Chimney Druaght

    By B. W. Prof. Frazier

    I PROPOSE in this paper to treat of the chimney merely as a heat engine, as one of the devices resorted to in practice for the conversion of heat into mechanical work. For the sake of simplicity and c

    Jan 1, 1882

  • DFI
    Soil-Cement Columns For Building Foundations

    By Osamu Taki

    The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are

    Jan 1, 1992

  • SME
    Trapezoidal Tapered Ring—Key Position Selection in Curved Tunnels

    By Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill

    The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv

    Jan 1, 2005

  • SME
    Battery Park Truck Sewer Emergency Tunnel Project

    By Mark Rybak

    On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse

    Jan 1, 2008

  • NIOSH
    RI 5991 Investigation Of Mercury-Antimony Deposits Near Flat, Yukon River Region, Alaska ? Summary And Introduction

    By R. P. Maloney

    Since mining operations began in 1900, Government geologists and mining men have periodically recorded the presence of the minerals of mercury and antimony in the extensive gold placer deposits near F

    Jan 1, 1962

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • NIOSH
    OFR-54-73 Evaluation Of Present Shotcrete Technology For Improved Coal Mine Ground Control

    By S. A. Bortz

    This report presents the results of an extensive laboratory testing program to determine the physical properties of shotcrete including the use of fast-set agents, controlled set cements, and both wet

    Jan 1, 1973