Search Documents

  • SME
    Floodplain Aggregate Mining in Western Oregon

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p

    Jan 1, 1999

  • NIOSH
    Introduction - The Mission (1e95bc54-0059-4f5c-9d91-c7c47a1539d5)

    The Bureau of Mines is responsible for a broad spectrum of programs for meeting the diverse and changing mineral resource needs of the Nation. These programs are managed by the Director and two Deputy

    Jan 1, 1980

  • IIMP
    Mejoramiento de la producción y reducción del ausentismo laboral en la actividad minera a través de la dietética y el ejercicio físico

    By Manuel Retamozo

    El presente texto señala cómo el ejercicio físico adecuado y la dietética mejoran la producción y disminuyen el absentismo laboral en la empresa minera BHP Billiton Tintaya S.A a través de un polític

    Jul 31, 2003

  • SAIMM
    Mining Complex Geology, Mitigation of Float Dust, and Developing Autonomous Machine Capability Using Horizon Sensing Technology for Coal Seam Boundary Detection

    By L. G. Stolarczyk, J. Duncan

    "SynopsisLong before the environmental movement, coal miners were suffering from occupational diseases that became apparent in the later years of service, and especially during the retirement years. C

    Jan 1, 2015

  • AUSIMM
    Relationship Between Degree and Cost of Crushing and Flotation Recoveries of North Lyell Ore

    IN all wet concentration processes it is of primary importance to determine to what degree the crushing must be carried in order to obtain the maximum profit per ton of ore milled.To effect a clean se

    Jan 1, 1927

  • CIM
    Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinates

    By J. B. Boisvert, P. Oshust

    A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry

    Jan 1, 2008

  • SAIMM
    Double-header trains at Great Noligwa mine - Synopsis

    By L. van Dyk

    The project was aimed at evaluating the double-header trains implemented at Great Noligwa mine, looking at the changes from the old conventional trains to the new trains, and identifying possible impr

    Jan 1, 2008

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • SME
    China’s Mineral Priorities and Current Projects

    By Sabina Brady

    Investment in the ferrous sector between 1981 and 1985 will total about $9 billion, or 7.6% of the state budget for capital assets. The money will primarily go to complete the first stage of the Baosh

    Jan 8, 1983

  • NIOSH
    A Guide For Reducing Fuel Consumption In Commercial Plants - Introduction

    By J. F. Barkley

    To aid in winning the recent world war, the Bureau of Mines conducted a National Fuel Efficiency Program, directed to commercial plants throughout the Nation, to save greatly needed fuel, a basic reso

    Jan 1, 1947

  • SAIMM
    A Heuristic Sublevel Stope Optimizer With Multiple Raises

    By X. Bai

    A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def

    Jan 1, 2014

  • NIOSH
    OFR-78-78 Feasibility Study Of Electric Shock Prevention

    By Gordon R. Sima

    The contract is concerned with feasibility studies, design and fabrication of a group of prototype hand-held test instruments and machine-mounted test instruments for measurement of electrical shock h

    Jan 1, 1977

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore (13a41608-dfe4-4266-9026-6b4afd0847bf)

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • IOM3
    Computer-aided instruction in mine automation

    By M. J. Scoble, L. M. Daneshmend, C. Hendricks

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993. An attempt is made to relate emerging technologies to education and training req

    Apr 1, 1994

  • SAIMM
    Multiphase Flow Modelling of Lancing of Furnace Tap-Holes: Validation of Multiphase Flow Simulated in OpenFOAM®

    By J. H. Zietsman, M. W. Erwee, P. J. A. Bezuidenhout, Q. G. Reynolds

    "Pyrometallurgical furnaces are tapped through tap-holes that are opened with drills and oxygen lances. The lance is often used on its own or as the last step of opening the tap-hole. Interaction of o

    Jun 1, 2019

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • AUSIMM
    The Brown Coal Geology of the Gippsland Basin

    By Holdgate G. R, Thompson B. R, Webster R. L, Bolger P. F

    The Gippsland Basin in south-eastern Australia has an area of approximately 46 000 sq km. It is one of the world's major coal and petroleum bearing basins, with most of the former occurring in

    Jan 1, 1992

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • SME
    Alberta Lake Re-Established After Draining to Mine Coal

    By Sukru Sumer

    East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west

    Jan 1, 1995

  • AUSIMM
    Mine Hygiene at the North Mount Lyell Mine

    THE North Mount Lyell Mine is situated on the southern side of Mount Lyell at an altitude of 1750 ft. above sea-level. The average rainfall is 117 in., and there are generally several light falls of s

    Jan 1, 1927