Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important StructuresBy Akihiro Higashide, Roy H. Patten
The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini
Jan 1, 1995
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based InclinometersBy Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
An Evaluation of Background and Anomalous Copper and Zinc Concentrations in the ôCopper Plantö Polycarpaea Spirostylis and Other Australian Species of the GenusThe copper and zinc contents of herbarium specimens of 11 of the 12 Australian species of Polycarpaea were determined in order to establish background and anomalous values of potential use in biogeoch
Jan 1, 1978
-
The interaction of rock mass properties and the project specific boundary conditions as basis for the design of deep excavation pitsBy R. Katzenbach, M. Vogler, U. Adamietz
Abstract The design of deep excavation pits in rock mass is dependent as well on the mechanical properties of the rock mass as for example the orientation and the type of discontinuities like bed
Jan 1, 2003
-
Determination of Blast Vibration Limits by Direct Strain MeasurementBy Adrian Moore, Alan Richards, Andrew Brodbeck
Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str
-
Subsidiary Mine DrainageUnderground Mine Drainage may be conveniently divided into two operations:(a) Collecting and transporting drainage water to the pump eastern.(b) Elevating water to the surfacc by pumping.This short pa
Jan 1, 1927
-
Endowment Funds (6843629e-f733-45af-884f-0648055957a6)The income of the Institute is derived mainly from dues, advertising in MINING AND METALLURGY and sale of publications. These sources are fortunately supplemented by the interest from invested funds n
Jan 1, 1939
-
Presidential AddressIn referring to two subjects of interest to the Members of this Australasian Institute of Mining Engineers, I would at the outset desire to express our gratification that to-day we are able to welcome
Jan 1, 1901
-
Multiple Seam Longwall Mining In The U.S.—Lessons For Ground ControlRelatively few longwall mines in the U.S. operate under multiple seam conditions where the two seams are less than 200 ft apart. This paper describes the experience of six that do. These operations
-
The Colomac ProjectBy V. N. Bryant
"1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec
Jan 1, 1990
-
Innovations In ScandinaviaBy Carl-John Grävare
This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq
Jan 1, 2000
-
Copper Hydrometallurgy – Evolution and MilestonesBy Nathaniel Arbiter
In contrast to pyrometallurgy's 6000year history in metals production, hydrometallurgy is of relatively recent origin. The earliest reference to it was in the 16th century, with the first applica
Jan 1, 1994
-
Good Delay Timing-Prerequisite of Efficient Bench BlastsVariations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul
Jan 1, 1977
-
Capital and Operating Cost Eestimation for Open Pit Mining EquipmentBackground information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c
Jan 1, 1990
-
Dangers of Toxic Fumes from BlastingBy Richard J. Mainiero, James H. Rowland III, Marcia L. Harris
This paper reviews the potential hazards posed by the toxic fumes produced by detonating explosives in surface mining and construction operations. Blasting operations produce both toxic and nontoxic g
-
Vibration Control Blasting for Low Stability Final WallBy Greg Wyartt
In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl
Jan 1, 2018
-
Shutdown and restart at Pinto Valley - a maintenance viewpointBy Robert S. Shank
Introduction The Pinto Valley open-pit copper mine is located in southern Arizona, 11 km (7 miles) west of Miami. Production at Pinto Valley began in 1974. About 350 Mt (386 million st) of ore and wa
Jan 4, 1985
-
Electric Welding Of Large Storage TanksBy Harold Price
ONE year ago, that is in January, 1923, there had not been constructed a single oil-storage tank of 55,000-bbl. or more capacity with a completely electric welded roof and bottom. Today, there are at
Jan 6, 1924
-
Railroad Bridge Approach Embankment Settlement MitigationBy Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery
Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate
Jan 1, 2018
-
IC 8065 Conversion Of Coal To Fluid Fuels: Abstracts Of Selected German Patent Applications ? Introductions And SummaryBy Ignaz Lichtig
[IN CONNECTION with its work on the conversion of coal to liquid cud gaseous fuels,3 the Bureau of Mines has always striven to keep informed of developments in this and related fields so that unnecess
Jan 1, 1961