Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and MonitoringBy Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
Sampling with The Long-Hole Rock Drill at North Broken Hill LimitedEarly in 1940 the development and sampling programmes in hand on the North and British Sections of North Broken Hill Limited were such as to necessitate the drilling of a large number of drill holes r
Jan 1, 1941
-
Ergonomic Interventions At Badger Mining Corporation (30a13109-bb6a-4698-a288-c4dfde51a853)By J. Torma-Krajewski, M. Lehman
In 2005, NIOSH and Badger Mining Corporation entered a partnership to implement ergonomic interventions, including a systematic process, to address exposures to risk factors that may result in musculo
Jan 1, 2007
-
The Water Flume Conveyors of the Mount Lyell Mining and Railway Company LimitedTHE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June) 1896, been derived continuously from the extensi
Jan 1, 1910
-
Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry AnalysisBy Olli Haavisto, Juha Timperi
"Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy
Jan 1, 2016
-
Carbon Management in a High Gold Price EnvironmentBy J K. Claflin, S R. La Brooy
A case study from a current Ausenco project is presented to demonstrate the importance of maintaining high carbon activity to illustrate the driving force for plant improvements such as a carbon regen
Jul 15, 2013
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Overview of Design and Practice of SDS Piles in ChinaBy Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu
"Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta
Jan 1, 2014
-
Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe IslandsBy Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen
An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya
Jan 1, 2007
-
Meadowbank Mine Process Plant Throughput IncreaseBy J. Allaire, P. N. Muteb
The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit
Jan 1, 2013
-
IC 8877 SIC-Based Demand Information System For Nonfuel MineralsBy George K. Schenck
This Bureau of Mines publication describes and evaluates a Standard Industrial Classification (SIC) based end-use data system for minerals that is designed to link the demand for minerals to economic
Jan 1, 1982
-
Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? SynopsisBy X. L. Huang
This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m
Jan 1, 2010
-
Rock Strength Characterization for Excavations in Brittle Failing RockBy B. H. Kim
It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength
May 1, 2009
-
Why Accounting for Uncertainty and Risk can Improve Final Decision-Making in Strategic Open Pit Mine EvaluationThe objectives of this paper are two-fold. First, it will show what problems can arise when single estimated values are substituted for a distribution of values when evaluating an open pit mine projec
Jan 1, 2009
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Tratamiento de minerales mixtos en Tintaya: geometalurgia, experiencias y creación de valorBy F. Parada Torres
Xstrata Tintaya S.A. opera el yacimiento a tajo abierto y procesa el mineral en dos plantas: Planta Concentradora de Sulfuros y Planta de Lixiviación de Óxidos, donde anteriormente consideraba al mine
Sep 12, 2011
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring MachineBy Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Cost Estimating Standards For International Reporting Of Ore Reserves: What Are They? What Should They Be?By O. Schumacher
Guidelines for publication of information defining the amount and grade of resource material available in a deposit are well established in Australasia?s JORC Guidelines, Canada?s National Instrument
Feb 27, 2013
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
A Contribution To Studies Of Piles Under Dynamic Loads - SynopsisBy R. J. Folic
Investigations of the vibrations of a pile in soil are performed on a dynamic model in the form of a prismatic bar of finite axial and flexural stifnesses with a discrete mass at its free end represen
Jan 1, 2010