Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle SandstoneBy Michael Murphy
A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.
Jan 1, 2014
-
Application in Design for Close Proximity Multi-Seem MiningVirtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl
Jan 1, 1987
-
Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow MineBy Robert J. Coutts, Dan A. Payne
"The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part
Jan 1, 2010
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar MiningBy Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015
-
Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and AbutmentBy Thierry Lavoie, Mark K. Larson
"Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement
Jan 1, 2016
-
Gateroads Layout and Entry Support in a Western Longwall Coal Mine in ChinaBy WenFeng Li
Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We
Jan 1, 2013
-
Coal Pillar Design in Tabas Central Mine of IranBy Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar
"The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the
Jan 1, 2010
-
Mining Under Rivers In Fuxin Coal MinesBy Liang Yin-Huai
In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.
Jan 1, 1990
-
Design Of Lower Seam Longwall Operations In Multiple Seam MiningBy P. Forrest
Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie
Jan 1, 1988
-
Subsidence and Ground Deformation Prediction in North America-A Case Study and New Method DevelopmentsBy Karsten Zimmermann, Peter Cain
"To receive regulatory approval for a new coal mining operation in North America, extensive investigations of feasibility and potential environmental impacts, including ground deformations, are requir
Jan 1, 2016
-
Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall PanelsBy Kenneth Rigsby
Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi
Jan 1, 2003
-
Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep OverburdenBy Joe Wickline, Mark A. Van Dyke, Wen H. Su
"Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr
Jan 1, 2017
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997
-
The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - IntroductionBy Robert C. Speck
Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo
Jan 1, 1981
-
A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate RoadBy Stephen P. Signer
A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r
Jan 1, 1990
-
Field Evaluation of Yield Pillar System at a Kentucky longwall HeadgateBy Christopher Mark
The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200
Jan 1, 1988
-
Analysis of Cutter Roof Using the Boundary Element MethodBy Mikko Ahola
This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac
Jan 1, 1987
-
Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and EvaluationBy Stephen Tadolini
Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no
Jan 1, 2002
-
A Comparison Of Overburden Response Due To Longwall MiningBy David K. Ingram
The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i
Jan 1, 1994
-
Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control ProblemsBy George J. Karabin
The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability
Jan 1, 1994