Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof FallsBy Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger
"Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the
Jan 1, 2015
-
The Broken Rock Zone Around Tunnels And Its Support TheoryBy Fangting Dong
The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s
Jan 1, 1988
-
Massive Pillar Failure--Two Case StudiesBy David H. Tang
Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes
Jan 1, 1984
-
Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface StructuresBy Arka Jyoti Das, Prabhat Kumar Mandal
"Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv
Jan 1, 2016
-
Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar MiningBy Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady
"A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou
Jan 1, 2015
-
Analysis of Monitored Ground Support and Rock Mass Response in a Longwall Tailgate EntryBy B. Tulu, D. Gearhart
A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a
Jan 1, 2017
-
Mine Convergence When Using Mobile Roof Supports In Pillar RecoveryBy J. R. Stoltz
To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr
Jan 1, 1999
-
Control Of Mine Subsidence Utilizing Coal Ash As A Backfill MaterialBy D. W. Evans
Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method
Jan 1, 1982
-
Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)By Deno Pappas
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr
Jan 1, 2002
-
Effect of In Situ Stresses on the Stability of Coal Mine Development WorkingsBy Murali Gadde
Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat
Jan 1, 2004
-
An Overview Of Bureau Of Mines Ground Control ResearchBy John M. Karhnak
The Bureau of Mines has a long history of research in Ground Control. For many years, this work was done at Bureau facilities by Bureau researchers. As the tiles changed, however, the area of research
Jan 1, 1981
-
Strata Mechanics Of Pillar Extraction Goaf Edges (001afab8-c7ac-48fa-af96-b8de57c1318e)By John Shepherd
Pillar extraction carried out using various methods (split and lift, Wongawilli and old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting off
Jan 1, 1992
-
Development of CAN ManipulatorBy Brian E. Perrine
Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting
Jan 1, 2013
-
Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)By Wilfried Ufer
[1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl
Jan 1, 1984
-
Roof Screening: Best Practices and Roof Bolting Machines (e5909744-6953-4a41-b02f-21226966b63f)By Susan Robertson
Many injuries are caused each year by rock falls in coal mines. Most of these injuries are not caused by major roof collapses, but from falls of smaller rocks from the immediate top or roof skin. Vari
Jan 1, 2002
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald MineIn recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving MiningBy Zhou Ying
Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden
Jan 1, 2001
-
Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping SeamBy Yongping Wu
Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The
Jan 1, 2013
-
Prevention. Control and Management of Coal and Gas OutburstsBy Lu Jiam Zhang
Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di
Jan 1, 1987
-
Stooping Low Safety Factor Pillars At Goedehoop CollieryBy Gift Makusha
The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm
Jan 1, 2003