Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Geology And Mineralization Of The Santa Rosa Gold Deposits, Panama

    By Don C. White

    Santa Rosa is a mid-Tertiary, volcanic-hosted, gold-silver deposit. Current proven and probable reserves are 8.9 Mt (9.8 million st) grading 1.5 g/t (0.044 oz/ st) gold, minable by open pit and amenab

    Jan 1, 1995

  • SME
    In Situ Coating Formation On Apatite Particles When Leached Using H2SO4 In The Presence Of Methanol

    By R. G. Swanton

    The Bureau of Mines is investigating the leaching of phosphate values from Florida phosphatic clay wastes using sulfuric acid (H2SO4) as the leaching agent and methanol as the solvent. Acid-alcohol le

    Jan 1, 1991

  • SME
    An Empirical Analysis Of Ventilation Requirements For Deep Mechanized Stoping At The Homestake Gold Mine

    By LeEtta M. Shaffner, John R. Marks

    INTRODUCTION In the last twelve years, underground stoping methods at the Homestake Gold Mine have evolved from open cut-and-fill with jacklegs, cribbed raises and electric slushers to ramp-based m

    Jan 1, 1993

  • SME
    The Agoyan Project, Ecuador Tunnel And Underground Powerhouse Excavation

    By Odd E. Hanssen

    In April 1982, the contracting Companies, ABV of Sweden and Hoyer-Ellefsen of Norway forming the Consorcio Escandinavo Agoyan, signed the contract for the construction of the civil works of the Agoyan

    Jan 1, 1985

  • SME
    Analysis and Prediction of Longwall Methane Emissions : A Case Study in the Pocahontas No. 3 Coalbed, Va.

    By Richard E. Ray, George N. Aul, Fred Garcia, William P. Diamond

    Increasing longwall panel dimensions, particularly face width in gassy coalbeds, may result in unexpected increases in methane emissions. To investigate this problem, continuous longwall face emission

    Jan 1, 1997

  • SME
    39. Discovery of the Little Boulder Creek Molybdenum Deposit, Custer County, Idaho

    By Keith Whiting

    The Little Boulder Creek molybdenum deposit is in central Idaho, in the White Cloud Range about 3.2 km (2 miles) northeast of Castle Peak, the highest peak in the range. The elevation of the deposit i

    Jan 1, 1991

  • SME
    Forging a path to low-carbon lime - ME Feature Article

    By Fiona Woody

    Lime and calcium products are essential building blocks to the modern world, used to purify drinking water, preserve foods, control pollution, improve crop yields, stabilize soil, pave roads and suppo

    Feb 1, 2026

  • SME
    The Interdependence Of Economic And Hydrologic Criteria In Planning Water Resources Development

    By S. W. Mao

    Hydrologic and economic criteria figure in many obvious ways in water resources development, but they are rarely linked quantitatively, and most of the applications are pertinent only to the case-in-p

    Jan 1, 1967

  • SME
    Ignition Of Methane By Frictional Sparks Between Metals And Rusty Steel

    By D. H. Desy

    This research was undertaken to establish the lncendivity of aluminum alloys against rusty steel under frictional impact conditions at typical coal mine fan speeds, to determine any differences in inc

    Jan 1, 1973

  • SME
    Mine Planning And Emission Control Strategies Using Geostatistics ? Introduction

    By Francis Martino

    There are numerous techniques and predictive models used by geologists and mining engineers to define coal reserves and plan mines. The traditional reserve estimation methods commonly used include the

    Jan 1, 1983

  • SME
    Holographic Measurement of Elastic Moduli

    By D. R. Schmitt, B. L. Jensen, T. J. Ahrens, C. L. Smither

    The in situ elastic moduli of rock are measured holographically by a borehole instrument in marble and oil shale. A point force induced displacement field is recorded with double expo- sure holography

    Jan 1, 1986

  • SME
    Cost Saving Initiatives - Boddington Gold Mine

    By Malcolm Wills

    Boddington Gold Mine commenced operation in 1987 with an initial production of 3.0 Mt/y at a grade of 3.5 git. Head grade has reduced over the life of the mine and the major response to the drop in gr

    Jan 1, 2000

  • SME
    Efficient use of additives to improve pneumatically emplaced backfill strength

    By L. W. Saperstein, MJ. Carlson

    With the goal of improving the strength characteristics of pneumatically emplaced material used for localized subsidence control, the binding additives fly ash, bentonite, and portland cement were exa

    Jan 1, 1990

  • SME
    Handling Of High Temperature Laterite Nickel Slurry

    By Harrie van Dijk

    Feeding laterite nickel slurry into high pressure acid­leach (HPAL) autoclaves in an aggressive environment with slurries heated up to 200°C requires a special pump design. For decades the GEHO pisto

    Jan 1, 2000

  • SME
    Drying Behavior of Some Sedimentary Phosphate Ores Related to Their Mineralogical and Textural Properties

    By Abdellah Chlk, Driss Msatef

    Sedimentary phosphate ores are known for their relatively high specific surface area and porosity, which have a positive influence on their reactivity when used as fertilizer in acidic soils or in the

    Jan 1, 1999

  • SME
    Simulation Of Mine Ventilation Under The Influence Of Mine Fires

    By Husheng Li, Zhongli Wu

    This paper discusses the fundamental strategies adopted in the simulation package FIRES developed for ventilation simulation under mine fires. These fundamental strategies include (1) fire characteris

    Jan 1, 1993

  • SME
    Semi-Autogenous Grinding Of Ray Mines Division Sulfide Ores ? Part II

    By L. D. Hartzog

    A pilot plant investigation of a semi-autogenous mill - ball mill circuit is described. The plant was operated with minus eight-inch diabase as feed material to the semi-autogenous mill. The semi-auto

    Jan 1, 1974

  • SME
    Methodology For Geotechnical Evaluation Of An Underground Powerhouse In Weak Rock

    By D. M. Cregger, J. L. Rosenblad, R. E. Ranken

    The construction of a large span, high-walled underground opening in a low strength shale rock is unprecedented. The feasibility of constructing a pumped storage project with several tunnels and a lar

    Jan 1, 1983

  • SME
    Monitoring Blind Backfilling in Abandoned Mines

    By Peter J. Huck, Bruce G. Stegman, Richard E. Thill

    Introduction Backfilling of mine voids is used to prevent or control the effects of subsidence on surface structures. The pumped-slurry, blind backfilling process has been successful for stabilizing

    Jan 12, 1983

  • SME
    Megaprojects: 50 Years, What Have We Learned?

    By John Reilly

    "INTRODUCTION Successful management of megaprojects, meaning delivery within budget, on time and according to expectations, is a fundamental requirement. Many projects have been successful, some have

    Jan 1, 2016