Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f
Jan 1, 2009
-
Though Not a Record Year, the Coal Industry Performs Well in 1983By L. Westerstrom
Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th
Jan 5, 1984
-
Horizontal Geotechnical Investigations for TunnelingBy Nick Salisbury, Alan Howard, Scott Tunison
INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to
Jan 1, 2005
-
Trapezoidal Tapered Ring—Key Position Selection in Curved TunnelsBy Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill
The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv
Jan 1, 2005
-
Battery Park Truck Sewer Emergency Tunnel ProjectBy Mark Rybak
On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse
Jan 1, 2008
-
Final Tunnel Liner At The Mill Creek 3 ProjectBy M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008
-
Seismic Response of Precast Tunnel LiningsBy J. Chai, H. H. Sedarat, Gary J. E. Kramer, A. Kozak
Precast concrete segmental lining systems have been gaining widespread use in seismically active areas and a single-pass version of such a system has been developed for use on the Silicon Valley Rapid
Jan 1, 2007
-
Snow Tunneling at the South PoleBy John H. Wright
The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)
Jan 1, 2002
-
Mining and Sustainable Development at Red DogBy D. H. Horswill
The Red Dog Mine is the world’s largest zinc mine. It is located 145 km (90 miles) north of the Arctic Circle in northwest Alaska on lands owned by the Inupiat Eskimo organization called the Northwest
Jan 1, 2000
-
Liebherr Celebrates 50th Anniversary, Introduces 300-ton Mining TruckBy William R. Yernberg
In October 1999, Liebherr-America, Liebherr Construction and Liebherr Mining Equipment held anopen house at its Newport News, VA, plant. The open house was held to celebrate the company’s50th anni
Jan 1, 2000
-
Effects of Chinese Mineral Strategies on the U.S. Minerals IndustryBy P. A. Plunkert, D. E. Morse, Pui-Kwan Tse, W. D. Menzie, Lucy McCartan, J. F. Papp
China’s burgeoning economy is responsible for a major share of recent world mineral consumption increases. In addition to factors traditionally recognized in market economies1 and factors unique to s
Jan 1, 2006
-
New Developments In Flow And Pipe Management Capabilities Through New Velocity Profile Measurement And Pipe Wall Wear Monitoring Instrumentation - Preprint 09-006New developments in the non-invasive and real-time measurement of the velocity profile of slurry flow in horizontal pipes will be described. This information can be used to determine the approach and
Jan 1, 2009
-
Nature Of Low-Grade Indian Iron Ores And The Prospects Of Their Enrichment Through Gravity SeparationBy S. Roy
Soft laminated iron ore (SLO) having a higher hematite content and Martite goethite iron ore (MGO) having a higher goethite content were subjected to detailed characterization and beneficiation. The p
Jan 1, 2009
-
Are Estimators Getting It Right? Comparing Actual And Estimated CostsBy J. Leinart
As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab
Feb 27, 2013
-
Annual Review 1992 – Exploration 1992Worldwide minerals exploration slipped in 1992 from 1991 levels. Although industrial production figures showed the US economy emerging from recession in early 1992, it was not until February 1993 that
Jan 1, 1993
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build ContractBy David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
Large diameter tunneling in Seattle is a sign of things to comeBy Christopher Bambridge
The Washington State Department of Transportation (WSDOT) is constructing a new tunneled route under Seattle to replace the existing State Route 99, Alaskan Way Viaduct (AWV), which follows the histor
Sep 1, 2013
-
Evaluation Of High-Temperature Disposable Filter Elements In An Experimental Underground MineFiltration systems with disposable filter elements (DFEs) are used in the underground coal mining industry to control particulate matter emissions from diesel-powered permissible and nonpermissible co
Jan 1, 2011
-
Current State Of Disc Cutter Design And Development DirectionsBy Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
Chambers Creek Interceptor Sewer TunnelBy J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass
The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll
Jan 1, 1985