Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Seismic Rehabilitation Of Seattle's Pier 69

    By David Pierce

    The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie

    Jan 1, 1992

  • DFI
    Pullout Capacity of Pile Groups in Sand

    By S. P. Mukherjee, Smita Tung

    "Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i

    Jan 1, 2015

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation

    By Zachary Q. Maassen

    Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio

    Jan 1, 2019

  • DFI
    Atoka Pipeline - Canadian River Crossing

    By Jewels Stover, Charles A. Luxford

    Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv

    Sep 8, 2021

  • DFI
    Finite Element Aided Design Method for Frozen Earth Shaft Support

    By Joseph A. Sopko

    The first documented procedures for designing frozen earth structures are over 50 years old, implemented long before the introduction of the Finite Element Method (FEM). Since that time, the developme

    Jan 1, 2019

  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • DFI
    Toward A Unified Design Standard For Steel Sheet Piling

    By Michael J. Garlich

    Steel sheet piling has a long history of use in a variety of permanent and temporary structures. Current engineering practice uses numerous publications and standards for design guidance. U.S. desig

    Jan 1, 2008

  • DFI
    Determination Of Thermal Conductivity Of Coarse-Grained Soils

    By Madhu. P, Srinivas. K

    Measurement of thermal properties like thermal conductivity, thermal resistivity, heat capacity and thermal diffusivity for materials, it plays a crucial role in a wide range of various civil and elec

    Sep 1, 2022

  • DFI
    Collaborative Value Engineering Redesign - DFI 2020

    By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin

    A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll

  • DFI
    Impact Of Groundwater Flow On Design Of Open Underground Excavation

    By Heman Manchanda, Sandeep Sharma

    Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen

    Sep 1, 2022

  • DFI
    Pile Set-Up to Optimize High-Rise Bridge Design

    By Charles Winter

    The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a

    May 1, 2022

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • DFI
    Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium

    By Christophe H. Locussol

    D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons

  • DFI
    Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil Nails

    By Daniel A. Thome, Robert C. Janke

    "Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and

    Jan 1, 2005

  • DFI
    Protection of Waterfront Properties by Pressed-In Sheet Pile Seawalls

    By Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa

    "This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco

    Jan 1, 2016

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    Foundations Settlement Estimation by Non-Linear Stress-Strain Approach Using CPT Records

    By Abolfazl Eslami, Fatemeh Valikhah

    "Complexity in soil-foundation interaction and subsoil nonlinear behavior cause difficulties and uncertainties in evaluating the actual values of foundation design factors such as settlement. The acqu

    Jan 1, 2017