Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Settlements Of Buildings On Pile Foundations

    By Mait Mets

    In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th

    Jan 1, 2002

  • DFI
    The Dutch Cone Penetration Test And Its Use In Determining The Pile Bearing Capacity

    By C. Van der Veen

    The use of the quasi static (Dutch) Cone Penetration Test (CPT) is described as a tool to predetermine the ultimate bearing capacity of the pile point. An analysis is given why a purely theoritical ap

    Jan 1, 1989

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014

  • DFI
    Comparison Of Dynamic And Static Methods Of Evaluating Static Pile Capacity - Synopsis

    By Harpal Parmar

    This paper evaluates dynamic methods of pile capacity prediction by comparing their results to static load test results. Dynamic and static pile load test data were assembled from four southeastern st

    Jan 1, 1996

  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • DFI
    Modelling For Consolidation Around The Pile Tip

    By Emöke Imre

    A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical

    Jan 1, 2002

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Connecting Railway Lines In Vienna With Underground Structures - Synopsis

    By Rüdiger Wunsch

    The new high speed Vienna - St.Pölten line and the Lainzer tunnel are to be connected to the existing Western railway line in Vienna. This involves building an underground cut and cover branching tunn

    Jan 1, 2000

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against Liquefaction

    By Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa

    "Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me

    Jan 1, 2014

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building ? Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017