Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • CIM
    Paste Backfill Strength Behaviour Using Different Binding Agents and Binder Combinations

    By Philip A. Dirige

    This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength

    May 1, 2006

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    The Outokumpu Copper Mine, Finland, and its Discovery

    By E. L. Bruce

    Introduction The Outokumpu copper mine is situated in eastern Finland, 50 kilometers west of the city of Joensuu or 225 kilometers directly north of the city of Viborg (Viipuri), which is situated at

    Jan 1, 1931

  • CIM
    Ecological Engineering and Biological Polishing Methods to Economize Waste Management

    By M. Kalin

    "SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly

    Jan 1, 1988

  • CIM
    Process Design Consideration for a Small Gold Mill in the Northwest Territories

    By A. M. Childs, R. F. Mather, K. R. Rawling

    "The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn

    Jan 1, 1983

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    An In-Plant Test of Sphalerite Flotation without Copper Activation

    By Q. Zhang, J. A. Finch

    "Sphalerite flotation in the absence of copper activation at moderately alkaline pH has been observed in laboratory studies. An in-plant test of this observation was conducted at Kidd Creek Mine LTD.

    Jan 1, 1992

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • CIM
    Ensuring Adequate Safety When Using Hydrogen as a Fuel

    By D. Allan Coutts

    Demonstration projects using hydrogen as a fuel are becoming very common. Often these projects rely on project-specific risk evaluations to support project safety decisions. This is necessary becaus

    May 1, 2007

  • CIM
    Design and wear of SAG mill shell liners at Brunswick mine

    By C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski

    "An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea

    Jan 1, 2005

  • CIM
    A Frother Concentration Meter

    By J. A. Finch, T. Weber

    "Bubble size in flotation is strongly influenced by frother concentration in the pulp liquor. There is no accepted method of judging the dosage and thus how effectively frother is being distributed to

    Jan 1, 2003

  • CIM
    New Method for Controlling the Volumetric Filling Condition in a Mill

    By J. Miettunen

    "The lining of a grinding mill has an important role in creating the conditions for the grinding process. The main purpose of the lining is to transfer the energy taken by the mill motor to the conten

    Jan 1, 1991

  • CIM
    Grindability Assessment Using Particle Size or Particle Surface Area

    By Baoquan An

    The energy required to fragment a rock is proportional to the increase in the fracture surface area and hence is proportional to the rock?s surface area. In comminution, the slope of the linear relati

    May 1, 2004

  • CIM
    Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)

    By Douglas M. Smith, G. A. Maki

    "The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa

    Jan 1, 1983

  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning

    By E. Lampard

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    May 1, 2011

  • CIM
    LKAB Green Pellets

    By F. Lindroos

    A cornerstone in the LKAB Green Pellet concept is to produce pellets with a small footprint in terms of energy con-sumption, CO2 emission and emission of other elements harmful to the environment, lik

    May 1, 2011

  • CIM
    A Focus on Variability within the Orebody for Improved Design of Flotation Plants

    By Glenn Kosick, Roger Amelunxen, Glenn Dobby

    "The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso

    Jan 1, 2002

  • CIM
    Developments in Conveyor Belting for Mines

    By J. B. Kitchin

    "The design of conveyor belting for use in mines poses problems to the manufacturer that are unique. The challenge to be met is that of the production of a conveyor belt which can withstand use and mi

    Jan 1, 1967

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004