Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Fracture characterization in granite using ground probing radar

    By Arthur L. Holloway, James C. Mugford

    "The Underground Research Laboratory (URL) is located in southeastern Manitoba, in the Lac du Bonnet granite batholith of the Canadian Shield. It was constructed by Atomic Energy of Canada Limited (AE

    Jan 1, 1990

  • CIM
    Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., Mexico

    By S. Cossio, J. L. Noyola, R. Espinosa

    "Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con

    Jan 1, 2004

  • CIM
    The Seabee Gold Mine Uncommon Accomplishment

    By Neil McMillan

    "By any measure of common practice, Claude Resources' Seabee Gold Mine in Northern Saskatchewan should not now be operating. Not because reserves dwindled, or grade dropped or prices weakened or techn

    Jan 1, 1998

  • CIM
    Effect of process variables in rotary degassing of aluminum

    By S. G. Shabestari, S. Saeidinia, P. Mokarian

    "The experiments were conducted to investigate the influence of various process parameters in rotary degassing of aluminum alloy AS5U3G. Degassing was carried out by use of argon inert gas. The flow r

    Jan 1, 2004

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • CIM
    Developments in Aircraft Materials and Processes

    By Paul E. Lamoureux

    Introduction The Author As the pail of smoke and wartime destruction gradually rises from the surface of the earth, from all countries, statesmen assemble to discuss and prepare pacts and treaties

    Jan 1, 1947

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    Development of Emiprical and Numerical Design Techniques in Burst Prone Ground at Goldcorp Inc.?s Red Lake Mine

    By Pravin Kumar

    Goldcorp Inc.?s Red Lake Mine (RLM) is situated in the Red Lake Mining District, a history rich North Western Ontario mining community. Red Lake Mine formerly known as the Dickenson Mine has experienc

    May 1, 2002

  • CIM
    Use of an on-Line Analysis System in the Flin Flon Concentrator

    By H. A. Dakin

    "An introduction to the metallurgical requirements of the Flin Flon concentrator reveals the magnitude of ore blending which is required in its operation of three flotation circuits. The resulting var

    Jan 1, 1974

  • CIM
    Scales or Scoundrels

    By Ron Board

    "Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo

    Jan 1, 1975

  • CIM
    Biological Monitoring and its Use in the Mining Industry

    By S. W. Stogran

    "Chemical and limited biological monitoring of mine and mill effluents are being used by regulatory agencies to monitor and control discharges to the environment. Amendments to the Federal Fisheries A

    Jan 1, 1994

  • CIM
    Alumina from Clays

    By Karim El-Ouassiti, Marc Minville, Stéphane Chabot, Claude Bazin, Valérie Ouellet

    "Alumina is the main source of aluminium and it is extracted almost exclusively from bauxite ores found in the Southern hemisphere. Clays are abundant minerals that contain from 15 to 40% w/w of alumi

    Jan 1, 2005

  • CIM
    The Adams Mine Iron Ore to Pellets

    By G. B. Bell

    "INTRODUCTION On February 1, 1962, after five years of exploration and research, Jones & Laughlin Steel Corporation announced that they would develop the Adams Mine. Plant construction began immediate

    Jan 1, 1973

  • CIM
    Environmental and Ventilation Benefits for Underground Mining Operations Using Fuel Cell Powered Production Equipment

    By Charles Kocsis

    Over the last few years a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell powered equipment into underground mines to replaced diesel engine powered equipmen

    May 1, 2007

  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992

  • CIM
    Maintenance management control through utilization of a computerized system at the Key Lake project

    By T. Warren, R. Pender

    "Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In

    Jan 1, 1990

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009