Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Du Pont Sequential Blasting System

    By D. O. Tansey

    This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show

    Jan 1, 1979

  • CIM
    Some Legal Unitization and Engineering Problems of Oil and Gas Producing Concerning Properties

    By D. W. MacFarlane

    In the formation of Oil and Gas Producing Units lawyer& and engineers are interdependent members of the same team. Management is, there-fore, entitled to expect no less than a total cooperative effort

    Jan 1, 1960

  • CIM
    Well Improvement Techniques 1n the Peace River Area

    By W. Hunka

    PACIFIC PETROLEUMS, Ltd. first discovered commercial quantities of gas in the Peace River area in 1952. Development of gas wells in this area is quite ex-pensive due to low penetration rates. To impro

    Jan 1, 1958

  • CIM
    Detail Flow Field and Performance Analysis of Inclined Hydrocyclones by CFD and Experiments

    By Narasimha Mangadoddy, Teja Reddy Vakamalla

    "Vertical hydrocyclones are very common in most of the comminution circuits. Inclined cyclones are also found for specific mineral processing applications. In this work, Computational Fluid Dynamics (

    Jan 1, 2016

  • CIM
    Iron Removal as Part of the Nickel Matte Leaching Process

    By M. J. Latva-Kokko

    This paper describes the behaviour of iron and the methods used for iron control in the nickel matte leaching process. OMG Harjavalta Nickel Oy processes approximately 10 000 t/y of iron, which enters

    Jan 1, 2006

  • CIM
    Hadean Uranium Activity 3rd International Conference on Uranium (Uranium 2010), 40th Annual Hydrometallurgy Meeting

    By Therese Schneck

    The presence of xenon isotopes from in-situ spontaneous fission of short-lived Pu244 has been confirmed in Hadean detrital zircons from Western Australia. Hadean and meteoritic zircons can retain seco

    Aug 1, 2010

  • CIM
    Impounding Influence of Slope and Foundation to High Arch Dam

    By L. Cheng, Y. W. Pan, Y. R. Liu

    "Impounding deformation of slope and foundation is significant during and post dam construction. Reservoir impoundment is accompanied with various phenomena, including material degradation, effective

    Jan 1, 2015

  • CIM
    Dez Arch Dam, 203 M High, 50 Years after Construction - Iran Reassessment of Rock Mass Foundation

    By A. Mehinrad, F. Rafia

    "The Dez River flows from the Zagros Mountains into the great Khuzestan plain, Southwest of Iran. The 203 m high Dez Dam is a double curvature thin concrete arch dam, with a Pulvino, founded on thick

    Jan 1, 2015

  • CIM
    Evaluation of High-Rate Clarification Processes for Mine Water Treatment with Cement Kiln Dust

    By A. L. Mackie

    Mine water from base metal mines is generally characterized as having high concentrations of heavy metals and low pH, resulting in the need for treatment prior to discharge to receiving waters. In thi

    Aug 1, 2013

  • CIM
    Using Real Time Elemental Analysis of Conveyed Ore Flows to Improve Copper Processing

    Real time analysis of ore quality between the mine and mill provides major benefits to copper mining and processing operations. Prompt gamma neutron activation analysis (PGNAA) is a proven technique t

    Jan 1, 2019

  • CIM
    The Regrinding of Copper Concentrate in a Stirred Ball Mill

    By A. O. Orumwense

    Mill circumferential speed, the number of passes of pulp through the grinding chamber, media type, size and filling ratio were investigated in an attempt to determine how to effectively grind copper c

    Jan 1, 2006

  • CIM
    Kearl Oil Sands Project Overview

    By Scott Hommema

    ? Bitumen in the oil sand averages Bitumen 12 wt%; water makes up 4 wt% ? Imperial Oil (operator) and ExxonMobil developing Kearl Leases #6, 36, 87 (~200 sq. km) ? Target resource > 4 Billion Bar

    May 1, 2008

  • CIM
    Shaft Sinking Through Heavy Overburden at Falconbridge

    By R. M. Oliver

    THE Falconbridge property is almost completely covered with over-burden to a depth varying from 60 to over 200 feet. This overburden consists of grave], sand, and boulder, with bands of very fine silt

    Jan 1, 1938

  • CIM
    Some Geochemical Considerations for Platinum-Group-Element Exploration in Layered Intrusions (538dc986-ca54-4e8c-8b54-af3cdab56d86)

    By A. E. Boudreau

    It has long been recognized that platinum-group-element (PGE) deposits in layered intrusions preferentially occur in intrusions that crystallized from high-Mg parent magmas. Recent studies suggest tha

    Jan 1, 1995

  • CIM
    Experimental Parameter Identification For a Dynamic Model of a Continuous Rod Mill

    By H. W. Smith, R. D. Fournier

    This paper presents the results of an investigation of a full-scale rod mill. Appropriate numerical techniques are developed for the experimental determination of the parameters of a dynamic mathemati

    Jan 1, 1972

  • CIM
    Industry and Higher Education - Meeting the Needs of the Mining Engineering Sector

    By Jessica E. Heuchan

    An industry survey has been conducted by the Queen's University Mining Engineering Department of 30 Canadian mining organizations to determine how effectively newly graduated mining engineers mee

    May 1, 2003

  • CIM
    The Carboniferous Basin - Land and Gulf

    By John G. McCamis

    The Maritimes Carboniferous Basin is the largest intermontane basin in the Appalachian Mountain System, occupying a total area of 57,200 square miles and containing up to 30,000 feet of late Devonian

    Jan 1, 1973

  • CIM
    Decommissioning and reclamation of the Beaverlodge uranium mine-mill operation: Current state of the transition phase

    By B. E. Halbert, K. T. Himbeault, S. L. Fernandes, R. L. J. Phillips, B. J. Topp

    The Beaverlodge uranium mining and milling facilities operated from 1952 to 1981 with about 94% of the ore extracted from the main underground mine and 6% from smaller satellite deposits. Decommission

    Jan 1, 2000

  • CIM
    Experimental Study On Application Of Bleed In Acid Isl

    By Meifeng Zhi, Yuqing Niu, Xixin Chang, Fengqi Zhao, Weimin Qiu, Hao Wang, Zhenqian Wen, Zujun Shu

    An applicable Eluex process was developed for acid in-situ leaching (ISL) uranium mine in Bayanwula. In this process, uranium was adsorbed with strong base anion resin from the pregnant solution, then

    Jan 1, 2020

  • CIM
    Some Principles and Practices of Profitable Gold Mine Operation

    By I. M. Marshall

    A review of technical literature covering Canadian mining emphasizes the advancement and changes that have been made in mining practice. However, current technical publications rarely outline basic pr

    Jan 1, 1939