Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility

    By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke

    "The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • CIM
    Flotation of REE Bearing Minerals from Silicate and Carbonate Host Deposits

    By T. Deng

    Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga

    Jan 1, 2014

  • CIM
    Regional geochemical mapping for earth science and environmental studies

    By R. B. Barlow, J. A. C. Fortescue

    Originally developed for use in mineral exploration, regional geochemical mapping based on stream (and lake) sediment sampling is showing broader application in other areas of the earth sciences and i

    Jan 1, 1980

  • CIM
    Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTS

    By Phillip J. Mackey, Gerardo R. F. Alvear F.

    It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to

    Jan 1, 2014

  • CIM
    Mining Tremors Effect Prediction: Models, Parameter Calibration and Uncertainty

    By P. Kolodziejczyk

    Mining seismicity can be harmful both under and on the surface. ? Tremors are not totally damaging, but destructive to buildings and infrastructure, especially in highly urbanized regions, such as Up

    Aug 1, 2013

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Labour occupational and mobility trends in the Canadian metal mining sector

    By Robert Keyes, Charle Knowles, Glenn Kendall, Gary Fletcher

    "The metal mining industry in Canada has been dramatically affected by the changes that have occurred in the world mineral market place. World economic restructuring in the post ""oil shock"" period o

    Jan 1, 1987

  • CIM
    Study of Gold Leaching with Bromine and Bromide and the Influence of Sulphide Minerals on this Reaction

    By Mani Manimaran, Inna Dymov, Mariam Melashvili, Chris Fleming, Joe O’Day

    This paper presents experimental evidence that supports the use of bromine/bromide as a potential alternative to conventional cyanidation for gold leaching. The study evaluated a brominebased lixivian

    Jan 1, 2014

  • CIM
    From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet Development

    By Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira

    Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal

    Jan 1, 2014

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • CIM
    Non-Wetting Rare-Earth Oxide Ceramics with Applications to Sustained Hydrophobicity

    By G. Azimi, K. K. Varanasi1, A. T. Paxson, R. Dhiman, H. -M. Kwon

    Hydrophobic materials that are robust to harsh environments are needed in a broad range of applications. Although durable materials such as metals and ceramics, which are generally hydrophilic, can be

    Jan 1, 2014

  • CIM
    A Novel Recycling Technique for Neodymium Magnet Scraps Using B2O3 Flux

    By Takahiro Kubo, Katsunori Yamaguchi, Hidehiro Sekimoto

    Equilibrium relation between B2O3 slag, RExOy-B2O3 (RE = rare earths) slag and Fe-C alloy formed by melting treatment of neodymium magnet and B2O3 was investigated. When neodymium magnet was melted to

    Jan 1, 2014

  • CIM
    COM 2014 Keynote: Process Control Applications in Mining & Metallurgical Plants Symposium Manual Control, Process Automation - Or Operational Performance Excellence? What is the Difference?

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2014

  • CIM
    The Onça Puma Nickel Project

    By Ruy L. Rodrigues

    Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t

    May 1, 2010

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014

  • CIM
    Unique Ceramec® Filter Technology Has Opened New Doors to Cost-Effective Dewatering

    By Bjarne Ekberg

    "The most economical way of dewatering mineral concentrates is to reduce the moisture content in the material mechanically using thickeners and filtration avoiding thermal drying whenever possible. In

    Jan 1, 2003

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014