Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Establishing the Best Practice Guidelines in Mineral Processing for NI 43-101

    By Tony Lipiec, Chris Fleming, Larry Urbanoski

    In 2009, the Canadian Mineral Processors (CMP) became aware that Canadian securities regulators were amending the contents of National Instrument 43-101. NI 43-101 is a set of regulations which establ

    Jan 1, 2011

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • CIM
    Circuit Design and Operational Philosophy Related to Custom Gold Ore Processing at Pamour

    By R. D. Lindsay

    Pamour Porcupine Mines, Limited has been actively engaged in the ''Custom Tolling'' of Gold-Bearing materials throughout the past decade. Experience acquired in this area was utilized to design and co

    Jan 1, 1987

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • CIM
    Mineralogy and pre-concentration of the chromite overburden of the Sukinda Ultramafic Belt, Orissa, India

    By R. B. Rao, B. Das, J. K. Mohanty, D. S. Rao

    Physical, mineralogical and geochemical characterization, along with some beneficiation approach to pre-concentrate the Ni content of the chromite overburden material of the Sukinda Valley, India, hav

    Jan 1, 2000

  • CIM
    Flash Flotation Circuit Design Considerations

    "The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa

    Jan 1, 2017

  • CIM
    Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator

    By G. Cordingley, A. Mwanza

    Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an

    Jan 1, 2014

  • CIM
    The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery Circuits

    By Z. Xiao, A. R. Laplante

    "The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri

    Jan 1, 2001

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    The Removal of Iron-Bearing Silicate Minerals from a Hard Rock Lithium Ore

    By T. Gammatikopoulos, C. Gibson, M. Aghamirian

    Lithium is an alkali metal found in brine deposits in the United States, Chile and Argentina, as well as in hard rock deposits in Australia and North America. In hard rock deposits, spodumene (LiAl(Si

    Jan 1, 2017

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation (1d1c391d-4ab9-408d-ad31-42faa02f60e9)

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2017

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017