    Commissioning of the Olympic Dam Smelter

    The production of copper by the Outokumpu direct blister process commenced in July 1988. The problems and incidents encountered in commissioning the main smelter equipment are outlined. Early diffi

    Jan 1, 1989

  • AUSIMM
    The Current State of the Art of Grade Control Blasting in the Eastern Goldfields

    By Van Rooyen F

    An introductory review of the current grade control blasting techniques (selective mining strategies) used in the Eastern Goldfields has recently been undertaken. The survey was initiated and conduc

    Jan 1, 1988

  • AUSIMM
    The Burra Treatment Process

    By Parker RL

    A 250 tons per day ammonia-ammonium carbonate leaching plant is now being operated by Samin Limited, to extract copper from the oxidised ores at the Burra mine. This forms the first stage of a plant

    Jan 1, 1971

  • AUSIMM
    Timbering Methods at the North Mine - North Broken Hill Limited

    The, Ore-bodies.-The ore-bodies of the North mine, North Broken Hill Ltd.; consist of two lenses, connected by a narrow neck of mineralized country. They pitch at an angle of 40° in an easterly d

    Jan 1, 1940

  • AUSIMM
    Ancient Thermotectonic Analysis as a Factor to Judge the Tectonic Setting of Early Precambrian Mobile Belt

    By Fengyan D

    Removing the interference of latter events, the data of geophysical (such as gravity and aeromagnetic) anomalies may indicate whether the mobile belt exist and whether the adjacent terrains of the mob

    Jan 1, 1990

  • AUSIMM
    Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

    By K E. Barns, P J. Sharman, S A. Thomas and

    This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl

    Jan 1, 2007

  • AUSIMM
    Problems Encountered in the Control of Mount Isa Mine Concentrators

    By Brasnett TC

    A wide variety of problems are encountered on a day to day operating basis in the Isa Mine Concentrators. These vary from complex textural problems in the lead-zinc concentrator and their subsequen

    Jan 1, 1978

  • AUSIMM
    Experiences eith the Electric Overhead Trolley System at the CSA Mine, Cobar

    By Roberts M. L

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Investigation of Minerals and Iron Oxide Alterations in Olivine Pellets Excavated from the LKAB Experimental Blast Furnace

    By A Benedictus, A Butcher, J Wikstr÷m, B Lindblom, E Rutqvist

    LKAB is a mining company situated in northern Scandinavia, manufacturing blast furnace- and direct-reduction pellets and sinter fines. Pellet development at LKAB comprises testing at laboratory and pi

    Jan 1, 2008

  • AUSIMM
    One Character Effects on Copper Heap Leach Management

    Copper heap leaching involves both the simultaneous and sequential leaching of very large tonnages of ore over long periods of time. It is not unusual to be leaching three or four million tonnes ove

    Jan 1, 1998

  • AUSIMM
    The Flotation Cell - A Critique

    Although the flotation cell has been under continuous development over the past 80 years, an understanding of the precise roles of a cell in produc- ing the flotation result had evolved slowly. In

    Jan 1, 1984

  • AUSIMM
    The Precipitation of Arsenic from Aqueous Solution in Relation to Disposal from Hydrometallurgical Processes

    By Glastras M. V

    The presence of arsenic in solutions which result from the processing of many sulphide minerals leads to a need to understand its speciation in aqueous systems and the reactions of those various s

    Jan 1, 1987

  • AUSIMM
    Classification Improvements Using Air Core Booster (ACB) Assisted Cavex Cyclones in the Mt Charlotte Circuit at KCGM

    By K Paki, K Parker, J F. Dupont

    The Mount Charlotte grinding circuit at KCGMÆs Fimiston mill was recently equipped with three 650 mm CAVEX cyclones in order to improve the overflow P80, reduce the fines bypass to the underflow and i

    Jan 1, 2007

  • AUSIMM
    Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis Instrumentation

    By Lovett EP, Johnson CR, Dunlop GA

    Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation

    Jan 1, 1986

  • AUSIMM
    The Engineering Tasks

    By Cairncross A. A

    Papers on technical aspects of the Melbourne Underground Rail Loop project are being presented at this conference or have been presented previously or will be presented at other forums. This paper

    Jan 1, 1981

  • AUSIMM
    Using Computational Fluid Dynamics (CFD) to Solve Mine Safety and Health Problems

    By Ren T. X, Jozefowicz R

    In many branches of engineering, there has to be an understanding of the motion of fluids in order to solve problems. Many safety and health problems in the mining industry are typical examples that

    Jan 1, 1995

  • AUSIMM
    A History of Drill Consumable Control at Renison Mine

    By Davison GR

    The cost of drilling consumables is always a large component of any mine budget. It is important that this cost be carefully examined with a view to reducing the overall cost per inetre or at least mi

    Jan 1, 1985

  • AUSIMM
    The Design and Construction of a "Batcave"

    By D Dickson

    The properties along Ida Avenue in Mosman stand 10 m above the road on an outcrop of Sydney sandstone. Access to the houses is generally via a long steep staircase. The owner of 22 Ida Avenue identifi

    Jan 1, 2008

  • AUSIMM
    Modelling of Magnetic Carrier Separation Process Using Computational Fluid Dynamics

    Modelling of Magnetic Carrier Separation Process Using Computational Fluid Dynamics

    Sep 13, 2010

  • AUSIMM
    The Isa Sizer - High technology Vibrating Screen

    Mount Isa Mines Limited commissioned the Heavy Medium Plant in August 1982. The first processing stage using Mogensen Sizer 2056 dry screens, experienced unresolvable cloth blinding problems in atte

    Jan 1, 1988