Commissioning of the Olympic Dam SmelterThe production of copper by the Outokumpu direct blister process commenced in July 1988. The problems and incidents encountered in commissioning the main smelter equipment are outlined. Early diffi
Jan 1, 1989
-
The Current State of the Art of Grade Control Blasting in the Eastern GoldfieldsBy Van Rooyen F
An introductory review of the current grade control blasting techniques (selective mining strategies) used in the Eastern Goldfields has recently been undertaken. The survey was initiated and conduc
Jan 1, 1988
-
The Burra Treatment ProcessBy Parker RL
A 250 tons per day ammonia-ammonium carbonate leaching plant is now being operated by Samin Limited, to extract copper from the oxidised ores at the Burra mine. This forms the first stage of a plant
Jan 1, 1971
-
Timbering Methods at the North Mine - North Broken Hill LimitedThe, Ore-bodies.-The ore-bodies of the North mine, North Broken Hill Ltd.; consist of two lenses, connected by a narrow neck of mineralized country. They pitch at an angle of 40° in an easterly d
Jan 1, 1940
-
Ancient Thermotectonic Analysis as a Factor to Judge the Tectonic Setting of Early Precambrian Mobile BeltBy Fengyan D
Removing the interference of latter events, the data of geophysical (such as gravity and aeromagnetic) anomalies may indicate whether the mobile belt exist and whether the adjacent terrains of the mob
Jan 1, 1990
-
Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator RecoveryBy K E. Barns, P J. Sharman, S A. Thomas and
This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl
Jan 1, 2007
-
Problems Encountered in the Control of Mount Isa Mine ConcentratorsBy Brasnett TC
A wide variety of problems are encountered on a day to day operating basis in the Isa Mine Concentrators. These vary from complex textural problems in the lead-zinc concentrator and their subsequen
Jan 1, 1978
-
Experiences eith the Electric Overhead Trolley System at the CSA Mine, CobarBy Roberts M. L
Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa
Jan 1, 1988
-
Investigation of Minerals and Iron Oxide Alterations in Olivine Pellets Excavated from the LKAB Experimental Blast FurnaceBy A Benedictus, A Butcher, J Wikstr÷m, B Lindblom, E Rutqvist
LKAB is a mining company situated in northern Scandinavia, manufacturing blast furnace- and direct-reduction pellets and sinter fines. Pellet development at LKAB comprises testing at laboratory and pi
Jan 1, 2008
-
One Character Effects on Copper Heap Leach ManagementCopper heap leaching involves both the simultaneous and sequential leaching of very large tonnages of ore over long periods of time. It is not unusual to be leaching three or four million tonnes ove
Jan 1, 1998
-
The Flotation Cell - A CritiqueAlthough the flotation cell has been under continuous development over the past 80 years, an understanding of the precise roles of a cell in produc- ing the flotation result had evolved slowly. In
Jan 1, 1984
-
The Precipitation of Arsenic from Aqueous Solution in Relation to Disposal from Hydrometallurgical ProcessesBy Glastras M. V
The presence of arsenic in solutions which result from the processing of many sulphide minerals leads to a need to understand its speciation in aqueous systems and the reactions of those various s
Jan 1, 1987
-
Classification Improvements Using Air Core Booster (ACB) Assisted Cavex Cyclones in the Mt Charlotte Circuit at KCGMBy K Paki, K Parker, J F. Dupont
The Mount Charlotte grinding circuit at KCGMÆs Fimiston mill was recently equipped with three 650 mm CAVEX cyclones in order to improve the overflow P80, reduce the fines bypass to the underflow and i
Jan 1, 2007
-
Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis InstrumentationBy Lovett EP, Johnson CR, Dunlop GA
Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation
Jan 1, 1986
-
The Engineering TasksBy Cairncross A. A
Papers on technical aspects of the Melbourne Underground Rail Loop project are being presented at this conference or have been presented previously or will be presented at other forums. This paper
Jan 1, 1981
-
Using Computational Fluid Dynamics (CFD) to Solve Mine Safety and Health ProblemsBy Ren T. X, Jozefowicz R
In many branches of engineering, there has to be an understanding of the motion of fluids in order to solve problems. Many safety and health problems in the mining industry are typical examples that
Jan 1, 1995
-
A History of Drill Consumable Control at Renison MineBy Davison GR
The cost of drilling consumables is always a large component of any mine budget. It is important that this cost be carefully examined with a view to reducing the overall cost per inetre or at least mi
Jan 1, 1985
-
The Design and Construction of a "Batcave"By D Dickson
The properties along Ida Avenue in Mosman stand 10 m above the road on an outcrop of Sydney sandstone. Access to the houses is generally via a long steep staircase. The owner of 22 Ida Avenue identifi
Jan 1, 2008
-
Modelling of Magnetic Carrier Separation Process Using Computational Fluid DynamicsModelling of Magnetic Carrier Separation Process Using Computational Fluid Dynamics
Sep 13, 2010
-
The Isa Sizer - High technology Vibrating ScreenMount Isa Mines Limited commissioned the Heavy Medium Plant in August 1982. The first processing stage using Mogensen Sizer 2056 dry screens, experienced unresolvable cloth blinding problems in atte
Jan 1, 1988