Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Steel Business - A Review

    By Burgess J, Brownrigg A

    The world steel industry underwent rapid growth from 1950 to 1970. Since that time, production growth has been relatively slow, with declining production in the developed countries and increasing prod

    Jan 1, 1992

  • AUSIMM
    Characteristics of Fluid Coexisting with Granitoids Associated with Miocene Iron-Copper-Lead-Zinc Mineralisation of the Chichibu Skarn Deposit, Japan

    By T Mizuta, H Satoh, M Ogasawara, M Miyata, M Fukuyama

    The Miocene Chichibu granitoids associated with the Chichibu skarn deposit are divided into North Body, South Body and Daikoku altered stock. Orebodies of the Chichibu skarn deposit are mainly distrib

    Jan 1, 2008

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997

    By A G. Greenwood

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include t

    Jan 1, 1998

  • AUSIMM
    Optimising the Usage of Magnetite at a Modern Coal Preparation Plant

    By Hoban M, Smith CJ

    Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne

    Jan 1, 1978

  • AUSIMM
    Contribution to the Study of the Mount Isa Copper Orebodies

    An investigation was made into the mineralogical characteristics of the upper portions of the 650 and 750 copper lodes. The investigation was based on a comprehensive suite of geological specimens rep

    Jan 1, 1961

  • AUSIMM
    Biological Filtration of Industrial Effluent Water: A Successful Case Study

    The production of 100,000 tonnes per year of synthetic rutile from the processing of ilmenite, coal and copperas (iron sulphate) produces 200 cubic metres per hour of effluent water. A 2.0 hectare

    Jan 1, 1988

  • AUSIMM
    Sampling Coarse Gold-Bearing Mineralisation ù Developing Effective Protocols and a Case Study From the Nalunaq Deposit, Southern Greenland

    By J S. Petersen

    The occurrence of coarse gold particles leading to grade complexity and sampling challenges is a common feature of many gold deposits. Poorly designed sampling protocols applied to these deposit types

    Jan 1, 2005

  • AUSIMM
    The Production of Superphosphate from Christmas Island Phosphate Rock

    The problem of manufacturing from sulphuric 'acid and Christmas Igland "A" phosphate, superphosphate of acceptable physical condition and agronomic phosphate availability, is directly related-

    Jan 1, 1971

  • AUSIMM
    Predicting Spontaneous Combustion in Spoil Piles from Open Cut Coal Mines

    By Saghafi A

    Spoil piles are produced routinely in open cut coal mines. Spoil piles may contain waste coal and other carbonaceous horizons. Coal and carbonaceous materials react with oxygen in the atmosphere, prod

    Jan 1, 1998

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    The Partition of Energy in Blasting with Non-Ideal Explosives

    By Lownds C. M

    Several classes of commercial explosives and blasting agents behave non-ideally, especially in diameters near their critical diameter. A direct and convenient measure of non-ideal behavior is the de

    Jan 1, 1990

  • AUSIMM
    PGM and Nickel-Copper Mineralisation in the Hartley Complex Zimbabwe

    The Hartley layered mafic igneous complex within the Great Dyke of Zimbabwe contains economically-recoverable quantities of platinum group metals and gold, nickel, copper and cobalt. The recoverable

    Jan 1, 1996

  • AUSIMM
    The Use of a Computer to Describe Blasting

    By Hengst B

    The first production stage in any mining operation is the breaking of whole rock into fragments small enough for loading and subseq- uent handling. This primary fragmentation is most frequently acc

    Jan 1, 1977

  • AUSIMM
    The Geological Setting and Mineral Potential of the Mount Stavely Volcanic Complex, Western Victoria

    By Ramsay WRH

    The Mount Stavely Volcanic Complex compri- ses one of a number of northerly trending fault bounded greenstone occurrences in Western Vict- oria, of probable Cambrian or older age. The greenstone bel

    Jan 1, 1982

  • AUSIMM
    Improvement of Mechanical Tool Performance by Waterjet Assistance

    The problems arising in the excavation of hard rocks with the use of mechanical tools consist chiefly in a slow advance rate accompanied by an intensive wear due to the toughness and abrasiveness of t

    Dec 6, 2010

  • AUSIMM
    An Approach to Coping with Unstable Pit Walls

    In any open pit mine some slope instability may be expected. This can range from small scale sliding on individual benches to large scale overall slope failure. This paper presents two case histori

    Jan 1, 1986

  • AUSIMM
    A Computer Network for the Extended Analysis of Data from a Computer Controlled Electron Probe Microanalyser

    By Penney B. K, Baghdadi A. A

    An electron probe micro-analyser, controlled by a dedicated mini-computer,has been operating at Imperial College since 1970. The data assessment capability of the computer was limited and, in order

    Jan 1, 1977

  • AUSIMM
    Pajingo Gold Mine - An Overview

    Battle Mountain Gold Company's Paj ingo Mine is the first gold mine developed by the Company in Australia. The Mine located in northern Queensland commenced operations in September 1987. The

    Jan 1, 1989

  • AUSIMM
    Sampling to Gain the Competitive Edge

    Sampling criteria and practical implementation of these criteria are discussed with a view of achieving and maintaining a high level of quality for minerals at their various stages of production throu

    Jan 1, 1985

  • AUSIMM
    Management of Major Aquifer Systems for Productive Mine Development in the Latrobe Valley

    By M Pratt

    For up to 75 years large scale coal mining has been carried out within the Latrobe Valley region of Victoria. Withdrawal of groundwater from Tertiary aged sediments within the Latrobe Valley is essent

    Jan 1, 2003