Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characterisation of Undermined Strata in Predicting Coal Mining SubsidenceBy Bhattacharyya A. K
In this paper, the current methods for predicting surface subsidence due to underground coal mining are evaluated first. A single index, called a strata parameter (P), is then proposed to describe t
Jan 1, 1995
-
Pushing the Use of High Pressure Grinding Rolls in Magnetite CircuitsBy B C. Povey
HPGR technology has been used at a number of magnetite mines in the world and have significant energy advantages over SAG and AG technologies. The early design at Los Colorados in Chile has been in op
Jul 15, 2013
-
Variable Energy Explosives for Soft Ground BlastingBy D Stow, R Goodridge, K J. Molloy
A range of explosives has been specifically developed for soft ground blasting. These explosives can be used in both wet and dry blasting conditions, range in density from 0.3 - 1.2 g/cc and range in
Jan 1, 2001
-
Overall Concepts in Drilling for Roof BoltingBy Tonegato S, Wood M
The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv
Jan 1, 1986
-
Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk ProfileBy S B. Sheldon
Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that
Nov 8, 2011
-
R&D roadmaps in mining and water management – a design-led approach to driving sustainability and innovationBy M Yadav, K Clode, S Daykin
The mining industry faces numerous challenges related to sustainability and circular economy principles, necessitating strategic approaches to innovation and resource management. As demands for minera
Sep 1, 2024
-
Incorporating Sustainability into Mining Plant and Infrastructure DesignBy A Murphy
Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They
Jul 16, 2014
-
The Development and Implementation of a Fully Remote Stoping Method at Beaconsfield Gold Mine, TasmaniaBy S Arthur, J Mills, A R. Penney
A key aspect of seismic management for narrow vein stoping of the west zone at the Beaconsfield Gold Mine has been the development of a fully remote extraction method that does not require personnel a
Jan 1, 2008
-
Development of a Continuous Process for the Selective Removal of Arsenic from Lead BullionBy Wiltshire PG
The process uses sodium hydroxide and sodium nitrate reagents as in conventional Harris refining plants, selectively removing the arsenic to the caustic phase at an operating temperature of 420-450
Jan 1, 1984
-
Welcome SpeechThe Honourable Tony McGrady, Queensland Minister for Minerals & Energy and our local member; the Deputy Mayor of Mount Isa, Alderman Bob Moore; members and guests of the Australian Institute of Mining
Jan 1, 1993
-
Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground OperationsBy C E. Gawith
The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc
Mar 15, 2021
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Determining Mineral Composition From AssaysBy W Whiten
The determination of mineral composition is necessary in the mineral sands industry. Tiwest has developed a procedure for safe and convenient determination of the mineral composition using a magnetic
Jan 1, 2001
-
The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal KneeshawBy R C. Morris
Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita
Jul 13, 2015
-
Agglomerate Flotation - A Method for Fine Particle RecoveryBy Hayward P. G
Complex ores, characterised by intimate intergrowths between minerals, have previously been treated by flotation with limited success. The most common problem has been that the liberation size is of
Jan 1, 1991
-
Permanent Rockbolts - The Problems are in the DetailBy R Bertuzzi
Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of
Jan 1, 1999
-
Quality programs (QAQC) on Sample Stations – a prerequisite to achieve standards requirements and perform a robust reconciliationBy O Dominguez
Mine value chain reconciliation (MVC) is a necessary procedure to evaluate a mine’s performance against the assumptions and models used to plan mining and processing operations. Using nomenclature fro
Mar 22, 2022
-
Radiation Doses in the Sand Mining Industry. What We Know and What We Don't KnowBy Toussaint LF
A brief history of the mineral sands industry is given from a radiation protection standpoint, with gamma radiation and inhalation of radioactive dust being identified as the main sources of radia
Jan 1, 1986
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-