Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dealing with uncertainties on mining equipment fleet planning and usage

    By I R. Souza

    At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro

    Nov 8, 2021

  • AUSIMM
    Past Achievements and Future Challenges in the Underground Coal Sector

    By B Robertson

    Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and

    Jul 1, 2013

  • AUSIMM
    A Study on Stress Distribution and Reasonable Size of Coal Pillar in a Coal Face

    By Wang QP, Quan YH

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the

    Jan 1, 1992

  • AUSIMM
    Streaming Conditions and Wear of Refractories in the Lower Part of A Blast Furnace

    By Kupper T

    Firstly, electric analog models are discus- sed to show fluid streaming conditions. In these models the depth of blast at tuyere level, the height of the bath, the influ- ence of different angles of

    Jan 1, 1981

  • AUSIMM
    Opportunities for rare earth element recovery from waste streams

    By K Clode, J Al-Shdifat, S Daykin

    Planning for a circular economy allows for previously untapped market opportunities to be explored, resulting in new, innovative revenue generating opportunities, while also reducing environmental imp

    Sep 1, 2024

  • AUSIMM
    The Modelling of Shock Effects in Blasthole Liner Experiments

    By Brinkmann J. R

    The relative effects of the two basic mechanisms contributing to rock breakage during blasting, shock and gas penetration, are neither well understood nor well characterized, and need further clarif

    Jan 1, 1990

  • AUSIMM
    Blue Mountains Sewage Transfer Scheme - A Review of Tunnelling

    By McQueen LB

    The Water Board has been involved in the development and ipgrading of sewerage facilities in the Blue Mountains since 1980. In 1984 the Board prepared a report that dealt with the Blue Mountains Sewag

    Jan 1, 1993

  • AUSIMM
    CAES System at KCGM ù Four Years On

    By L O. ÆNeill, J Bebek

    When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin

    Jan 1, 2003

  • AUSIMM
    Investigation of Raceway Dynamics on A Model

    By Scherbatsky VB, zon BM, Babushkin NM, Kitaev BI, Shabel&apos

    The structure and hydrodynamics of the raceway zone of a blast furnace was studied on a cold model representing a sector containing two tuyeres. The model differed from the usual in that it was pro

    Jan 1, 1981

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Design and Rehabilitation of Large External Waste Dumps: a Case Study

    By Fletcher G

    This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba

    Jan 1, 1992

  • AUSIMM
    Kalgoorlie Nickel Smelter: Integration of Flash Smelting and Slag Cleaning within one Process Unit

    By Hohnen CA, Limerick JM, Hall DRT

    An uniquely-designed flash furnace for smelting of nickel concentrate and for the recovering of metal values from the slag generated has been in successful use for nearly six years. Within the las

    Jan 1, 1984

  • AUSIMM
    Guidelines for Selecting Pellet Plant Technology

    By J Bolen, I Cameron, M Huerta, M Okrutny, K O’Leary

    As greater amounts of fine iron ore concentrates enter the marketplace, new investments in iron ore pelletising capacity are inevitable to deliver these concentrates to steel industry consumers. When

    Jul 13, 2015

  • AUSIMM
    Nature of Uranium Mineralization and Associated Wall Rock Alteration in the WhiteÆs East Area of the Embayment, Rum Jungle, Northern Territory

    By Borshoff J, Von Pechmann E

    The uranium mineralization in the White's East area of The Embayment is hosted by Lower Proterozoic schists of the Masson Formation which have undergone polyphase de- formation and upper greens

    Jan 1, 1984

  • AUSIMM
    Geotechnical Studies for Open Pit Mines - West Australian Operating Experience

    Recent operating experience from West Australian open pit gold mines has shown that geotechnical input into initial design is rare. As a result, ground stability is poor - almost half the pits designe

    Jan 1, 1990

  • AUSIMM
    Commissioning and Operating Experience with GekkoÆs Gold Ore Treatment Plants

    By S Gannon, J Abols, T Hughes

    In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilises conventional crushing and ball

    Jan 1, 2006

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    Metallurigical Considerations in grade Control

    Grade control is an important factor in the on-going success of a mining operation. Grade control criteria will vary depending on the commodity being mined. Financial considerations determine the actu

    Jan 1, 1993

  • AUSIMM
    Evaluation of an Alluvial Gold Deposit Gorge Creek, Upper Cape River Area North Queensland

    By Doxford CI, Perry AJ

    Mining Lease 908, situated on Gorge Creek near its confluence with the present Cape River system, has been subjected to intensive recent exploration for alluvial gold.The gold is hosted by a buried pa

    Jan 1, 1986