Improving flotation hydrodynamics to maximise nickel recovery from tailingsBy M Yvon, S Parkes, K P. Galvin, P Wang
Mineral liberation is critical to maximise the grade and recovery of nickel, however this objective is challenged considerably by the poor flotation kinetics, especially that of ultrafine particles (K
Aug 24, 2022
-
Effect of the Recycling Load on the High Pressure Grinding Rolls' Performance - A Case Study with the Industrial Unit During Cement Clinker GrindingBy H Benzer, N A. Aydogan
It is well known that the high pressure grinding rolls (HPGR) can only be operated efficiently under choke feeding conditions in which a material bed is built up between the rollers to ensure interpar
Jan 1, 2009
-
Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)By L Stitz, S Kinnear, L D. Fabbro
Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further
Nov 26, 2013
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary WorksBy D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007
-
New Backfill Binder and MethodBy M Grossi, G Baiden
This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and onsite applications. The new binder has several advantages over
Jan 1, 1998
-
Using Dynamic Simulation Throughout a Process Plant's Life CycleUsing Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010
-
Loading of Au(CN)2 - Solution Onto Activated CarbonBy Linge HG, Klauber C
The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined
Jan 1, 1989
-
Economic and Environmental Constraints on Use of South Island Resources for Power GenerationSince the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated
Jan 1, 2003
-
Mining and Health in Development - An Inventory of Global Resource Industry Health Initiatives in Developing CountriesBy J Harris, P Kirsch, R LaBouchardiere
æMining + Health in DevelopmentÆ is a project funded by the International Mining for Development Centre (IM4DC, 2012) to develop a centralised database of corporate sustainability initiatives for mana
Nov 20, 2012
-
Observations From the Magazine Dump Clay Capping TrialBy D Ray, D Brett
A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c
Jan 1, 2003
-
Extension Strain ù A New Concept in Open Pit Slope Stability, and its Use in the Explanation of Two Slope FailuresBy G J. Keyter, P J. Terbrugge, Yu Xianb
There has been disappointingly little development in the understanding of the behaviour of rock slopes in open pit mines over the past 30 years. The lack of development in general, and of robust, stan
Jan 1, 2003
-
Final SessionThe seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res
Jan 1, 1973
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production PlanningBy C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Design and Construction of Tunnels for Northern Gateway Project, New ZealandBy M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008
-
Heavy Medium Separation at Iscor's Sishen Iron-Ore-MineThe Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2
Jan 1, 1987
-
Laser Scanning of Conveyor Ore ProfilesBy S Grobler, T Fares
Understanding the real utilisation of the available volumetric capacity of a conveyor is key to unlocking latent capacity or ‘debottlenecking’ existing plant. Conveyors are typically designed on the b
Jul 13, 2015
-
Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic AnalysisBy M Paakkunainen
Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several
Jan 1, 2005
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014
-
World Copper Demand in 2050For the mineral industry, sustainability seems to mean socially positive and ecologically neutral mineral extraction. Mines are financed and developed in response to demand for their products. The pur
Jan 1, 2002
-
Open Strip Pitwall Instability at Goonyella Mine-Causes and EffectsBy Richards BG, Komdeur W
Instability in spoil piles and in high wall slopes in natural overburden has been ex- perienced at Utah's Goonyella Mine since com- mencement of operations in early 1971. Annual production target
Jan 1, 1978