Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Banker's View of Cash Flow Methods in Mineral Valuation

    Banks' focus in using cash flow methods can differ markedly from that of equity investors. This paper attempts to explain and describe bankers' approach by: ò outlining the fundamental dif

    Jan 1, 1994

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • AUSIMM
    Coarse processing of South African banded iron formation (BIF)

    By N Maistry, C Carelse, A Singh

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are mainly composed of iron oxides (hematite and magn

    Sep 18, 2023

  • AUSIMM
    Recent Developments in the Gravity Concentration of Gold at Peko Mines LTD, Warrego N.T.

    From August 1962 to June 1976 Peko Mines Ltd. produced Gold Bullion at the Peko Control Mill using 18x24 Denver Mineral Jigs and strake tables. Gold ores treated during this period were obtained fr

    Jan 1, 1978

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Automated Location of Gold in Samples from Australian Concentrators

    By Sparrow G. J

    In a recently completed AMIRA project, 20 samples were searched for gold mineralisation using the automated location facility (ALF) for rare phases on a scanning electron microscope in the CSIRO Div

    Jan 1, 1992

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Reducing Gassiness of Outburst-Prone Coal at Coal Basin Mines, Colorado, USA

    By Martin T

    High methane content of the medium volatile metallurgical coal mined from the Coal Basin mines causes very difficult mining conditions. Rapid desorption into the mine ventilation system limits coal

    Jan 1, 1982

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    Implementation on stability of rock slope in abandoned quarry wall – Singapore case study

    By H A. Linn, K Winn, C W. Lee

    The Q-slope method for rock slope engineering was developed to enable engineering geologists and rock engineers to rapidly assess the stability of excavated rock slopes in the field and make optimal a

    Nov 29, 2022

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Design of Hydraulic Backfill Distribution Systems - Lessons From Case Studies

    By D Gericke, R Cooke

    This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an

    Jan 1, 1998

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    Flash Smelting with 95% Oxygen Process Air in Ashio

    By Kohra A, Shoji S

    The amount of copper production by flash smelting process occupies about 17% (equivalent to 1.4 million t/year) of total free world production. In Japan, 650,000 tons of copper is produced annuall

    Jan 1, 1987

  • AUSIMM
    A review of the most common underground slot, winze, rise or raise designs

    By E Wargem

    The conventional method of underground mining involves a process known as drilling and blasting to excavate valuable ore bearing minerals through the load and haul process. Drilling and blasting proce

    Mar 29, 2023

  • AUSIMM
    Selection and Planning of Fully Mobile In-pit Crusher and Conveyor Systems for Deep Open Pit Metalliferous Applications

    By M Dean, M Nehring, P Knights, M S. Kizil

    Integrated continuous mining techniques such as fully mobile in-pit crusher and conveyor (FMIPCC) systems offer inherent labour, energy and environmental benefits to deep pit metalliferous mines. Howe

    Nov 4, 2015

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Whither Lime? In Situ Hydrotalcite Precipitation as a Method of Remediation for Acidic Mine Lakes

    By G B. Douglas

    Lime-based neutralisation has long been the remediation treatment of choice for acidic mine pit waters. While suited to the attenuation of acidity, lime-based neutralisation may be difficult to implem

    Jul 27, 2015

  • AUSIMM
    Hej Hej Sweden, Tak Atlas Copco - The 2006 Atlas Copco Scholarship Experience

    By J MacDiarmid

    Atlas Copco is a leading provider of industrial productivity solutions (Atlas Copco, 2007) and one of the worldÆs largest suppliers of rock drilling equipment. The business division of Atlas Copco Con

    Jan 1, 2007

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011