Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012
-
Some Aspects of Longwall Ventilation in Australian Coal MiningBy Savidis G
The characteristics of 'Z' (Back-over run) and 'R' (Reverse) ventilation systems are dis- cussed in relation to their suitability for longwall mining. Experience in European mines
Jan 1, 1983
-
Oxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate SolutionsBy Ricketts N. J, Smith G. D J
A hydrometallurgical process was developed for recovery of copper from copper-lead matte formed as an intermediate product at the BHAS lead smelter at Port Pirie. A plant utilizing this process was
Jan 1, 1987
-
A Revision of Ore Evaluation Techniques at Sishen Iron Ore Mine, South AfricaBy Schoning W. L
Ore deposit models form the basis for numerous other economic decisions in the mining process. The success of these economic decisions therefore depend directly on the accuracy of the ore evaluation
Jan 1, 1995
-
US Bureau of Mines Coal Mining Automation ResearchBy Bevan JE
The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re
Jan 1, 1991
-
Lateritic Weathering of Serpentinite at Rockhampton, QueenslandBy Hewitt D
A study of two laterite profiles developed on a serpentinite near Rockhampton, shows that loss of Si02 and MgO results in the relative concentration of Fe203, A1203 and a number of minor elements.
Jan 1, 1974
-
Risks beyond relinquishment – quantifying post-relinquishment management and maintenance costsBy M R. Lane, M L. Cramer, N P. Wines
Increasing attention is being focused by regulators and industry on the residual environmental liabilities associated with mining projects following site relinquishment (termed surrender in Queensland
Aug 2, 2023
-
Methane Drainage Under the No. 7 Longwall Block Appin CollieryBy Regan R
Appin Colliery mines the Bulli Seam with a gas composition of 98.5% methane and 1.5% carbon dioxide. Relaxation of the strata generally occurs to below the base of the Wongawilli Seam, some 40 m be
Jan 1, 1982
-
A Case Study of Water Management on Closure of an Open Pit Mining Operation in North Queensland, AustraliaBy P Ritchie, E H. Briese, N A. Currey
Kidston Gold Mines, located in semi-arid North Queensland, Australia is currently in its closure phase. Highly innovative and comprehensive rehabilitation strategies were employed at the site, includi
Jan 1, 2003
-
Non-Electric Mass Blasting as Practiced at Mount CharlotteThe proximity of the Town of Kalgoorlie to the Mount Charlotte mine necessitates that charge weight per delay be limited in order to keep surface vibration levels within acceptable limits and to re
Jan 1, 1982
-
Decoupling the pulp and froth effect of ultrafine particles on Itabirite iron ore flotationBy B McFadzean, N P. Lima, D A. Deglon
The reverse flotation of Itabirite iron ore is typically performed after a desliming step in which most of the sub-10 µm particles are removed. This is done to limit processing problems such as poor f
Aug 24, 2022
-
Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 KBy G H. Park, Y J. Jun, J H. Park
The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on
Jun 19, 2024
-
Selection of Entrainment Control Processes in Copper Solvent Extraction PlantsBy K Dudley, D Readett
The design of entrainment control processes in copper SX plants has been studied by use of models based on achievable plant performance. A number of alternatives have been assessed for their suitabili
Jan 1, 2002
-
Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal SystemBy Susanto A
As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the
Jan 1, 1989
-
æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel ProductivityBy J Battista, J Grace, I Brunton
The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This
Jan 1, 2004
-
Refined Zinc Metal Production at the MinesiteProduction of refined zinc (99.95 per cent) at the minesite without increasing greenhouse gas emissions is considered. As an example, exploitation of the full reserve of the McArthur River orebody is
Jan 1, 1998
-
A New Method for Sampling from High Capacity ScreensBy B W. Atkinson
Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,
Aug 21, 2012
-
Thin Spray-on Liners Potential in Reducing Dilution of In Situ Gas in Underground CoalminesBy Z Li, D Chalmers, J M. Tenney
This paper presents the findings and analysis of the investigation of effectiveness of thin spray-on liners (TSLs) as a gas management tool in underground coalmines. The project involves spraying TSL
Aug 31, 2015
-
Reduction of Iron Content from Silica by Gravitational ProcessesReduction of Iron Content from Silica by Gravitational Processes In this research work, it was attempted to reduce the iron contents (Fe2O3) in silica sample which was provided from Shenin silica min
Sep 13, 2010
-
Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons LearntBy R Jacobs, J Yeates
"The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat
Mar 8, 2016