Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Phase relationship of quaternary system FeO-Al2O3-SiO2-‘V2O3’ at 1873 K and its impact during melting of H-DRI for possible vanadium extraction

    By A Vickerfält, J Huss, J Martinsson

    The European Union has listed vanadium (V) as one of the critical raw materials for the transition to a future green society, as stated in the Critical Raw Material Act, written by Grohol and Veeh (20

    Aug 21, 2024

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Immersible Probes Eliminate Sampling in On-Stream Analysis

    By Stump NW

    Until a year ago all isotope on-stream analysis utilised flow cells similar to those designed for conventional X-ray on-stream analysis. These systems incorporated a fairly complex sampling system n

    Jan 1, 1971

  • AUSIMM
    Underground Aquifer Dewatering and Water handling Within the Stratiform Zn-Pb-Ag Orebody at the Hilton Mine, Mount Isa, NW Queensland

    Three separate and unconfined aquifers occur in the Hilton area, named relative to position in relation to ore horizons: Footwall Aquifer in the east; Ore-Zone Aquifer within the ore-bearing Urquhart

    Jan 1, 1993

  • AUSIMM
    Reverse stoping using wireless initiation at CSA Mine

    By B Small

    CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca

    Mar 29, 2023

  • AUSIMM
    Seismically Active Mines ù To Buy or Not to Buy

    In recent years there have been many changes in mine ownership due to the on-going rationalisation towards larger mining companies. Larger companies inevitably find it hard to manage small mining oper

    Jan 1, 2002

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    The Practicalities of Implementing Net Volume Licensing of Water Use in Mines and Quarries - A Discussion Based on Victorian Case Studies

    By A Horne, Z Graszkiewicz, D Dettrick, R Evan, B Neal

    "Most of VictoriaÆs rivers and aquifers are already fully allocated or reaching full allocation. In regions without a well-established water market, access to water entitlements to facilitate new deve

    Nov 26, 2013

  • AUSIMM
    Queensland Mines Should Consider Climate Change Impacts for Decommissioning

    By M C. Evans

    "Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require

    Jul 16, 2014

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Tech Services - It's a Blast

    Two years ago I was sitting in a big lecture theatre at the School of Mines in Kalgoorlie at the annual New LeadersÆ Conference listening to a guy tell us all how much he loved his job, travelling the

    Jan 1, 2008

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • AUSIMM
    Martha Mine - An Update

    Martha Mine is an open pit gold-silver mine, located within the township of Waihi, 150km southeast of Auckland and is operated as a joint venture between Normandy Mining Ltd. 67 %) as Manager and Otte

    Jan 1, 1999

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Geological Settings of Gold Districts in Myanmar

    By C Ausa, Nyunt Htay, A, L Deiparine

    The main tectonic elements in Myanmar are a late Mesozoic and Cenozoic magmatic arc system in the west, repeated in northern Myanmar by more than 300 km of dextral movement on the Sagaing Fault, and t

    Jan 1, 1999

  • AUSIMM
    Effect of liquefaction controlling components in carbon-free mould powder for the continuous casting of ultra-low carbon steels

    By N Gruber

    In the continuous casting of ultralow carbon (ULC) steels, free carbon is used to control the melting behaviour of mould powders. If the carbon is not completely removed during melting, it is enriched

    Jun 19, 2024