Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Archaean Gold Systems of South Australia

    By A Reid

    The Late Archaean of South AustraliaÆs Gawler Craton contains significant potential for gold resources. The main targets of interest are migmatised gold style systems of which the Challenger deposit i

    Jan 1, 2007

  • AUSIMM
    Experimental Studies in the System PbS-FeS-ZnS-(Ag2S) at 1 Atmosphere to 27 Kilobars: Implications for the Broken Hill Orebody

    Experimental petrology may be used to accurately constrain PTX conditions in order to calibrate and understand geologic processes. This method may be used to answer postulated questions, by recreating

    Jan 1, 1998

  • AUSIMM
    Geotechnical Applications of Geophysics in Coal Mining

    In coal mining, geophysical techniques have an established application in determining the location of seam boundaries ahead of the face so that underground mines can be planned to avoid any geological

    Jan 1, 2002

  • AUSIMM
    The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR

    By A Hoyle, P Walker, D Bennett

    The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent

    Sep 7, 2015

  • AUSIMM
    Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone

    By D Hill

    In the Ngakuru area zeolite deposits occur in late Quaternary lacustrine vitric tuffs of the Ngakuru Formation and two of the deposits are being mined. The Ngakuru Formation overlies the Ohakuri Ignim

    Jan 1, 2005

  • AUSIMM
    Styles of High-Sulphidation Gold, Silver and Copper Mineralisation in Porphyry and Epithermal Environments

    High-sulphidation (HS) gold, silver and/or copper deposits are generated in both the epithermal and the upper parts of the underlying porphyry environments over vertical intervals of up to 2 km. The H

    Jan 1, 1999

  • AUSIMM
    Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes Deposit

    By D Craw, L Cox, R J. Norris

    The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to

    Jan 1, 2005

  • AUSIMM
    Development Aspects of the Golden Cross Project

    Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover

    Jan 1, 1990

  • AUSIMM
    A Magnetic Hydrocyclone

    The concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce

    Jan 1, 1984

  • AUSIMM
    Rock and Coal Type Distribution in the Greymouth Area: Applications for Mining

    The Main Seam occurs in two 'pods', termed North and South, separated by an east-west oriented 'want' zone (most probably a palaeo-channel). The seam on either side of the 'wa

    Jan 1, 1996

  • AUSIMM
    When Organisations Fail: New Thinking on Disasters

    Disasters are often tragic outcomes of high-risk technologies such as mines. In Australia, more mines are being developed every day, and the risk of disasters is ever increasing. No matter how effecti

    Jan 1, 1999

  • AUSIMM
    Alluvial Gold and Gold Mobility in Quartz Gravels, Waimumu, Southland

    Detailed characteristics of gold from Pliocene auriferous quartz gravels from Waimumu (Southland) have been studied using a combination of optical microscopy, energy dispersive microprobe analysis and

    Jan 1, 1987

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • AUSIMM
    The Use of Novel Approaches to Separate Heavy Minerals from AlbertaÆs Oil Sands

    By J Coward, S Bulatovic

    There are currently two operators producing oil from the surface-mineable portions of AlbertaÆs oil sands (Syncrude Canada Ltd and Suncor Inc) and two other companies are proposing to enter the indust

    Jan 1, 2001

  • AUSIMM
    Environmental Procedures and Mining - An Introduction

    In the last two years the Commission for the Environment has received four Environmental Impact Reports (EIR) for Audit and has been or is involved with at least four environmental impact assessments

    Jan 1, 1986

  • AUSIMM
    Research on Universal Depressant of Talc and Serpentine

    Research on Universal Depressant of Talc and Serpentine

    Sep 13, 2010

  • AUSIMM
    Secondary School Science Teachers as the Key to a Sustainable Workforce in the Mining and Mineral Processing Industry ù Changing PeopleÆs Attitudes

    By N J. Welham

    This paper reports on an innovative professional development program for school science teachers run collaboratively between the Centre for Sustainable Resource Processing and Murdoch University. Ulti

    Jan 1, 2007

  • AUSIMM
    Modelling Structural and Lithological Controls on the Mobility of Fluids and Gold in Orogenic Belts – Examples from New Zealand and Taiwan

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Southern Alps of New Zealand and the mountains of Taiwan are both young transpressive o

    Mar 18, 2015

  • AUSIMM
    Evaluating the Effects of Non-coaxial Charges for Contour Blasting

    By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt

    Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a

    Aug 24, 2015

  • AUSIMM
    Gravity Cleaning of Fine Coal

    Traditionally, the gravity cleaning of coal has been evaluated in pilot plant tests. Attention is now turning to the development of empirical models of gravity cleaning equipment that can be used for

    Jan 1, 1985