Search Documents

  • SAIMM
    Quadratic Programming For The Multi-Variable Pre-Homogenization And Blending Problem

    By M. Kumral

    Raw material fed into a processing or refining plant is required to be uniform in composition for several reasons. When the mined ore is highly variable in quality the only way to ensure consistency i

    Jan 1, 2005

  • SAIMM
    Prediction Of Bubble Size Distribution In Mechanical Flotation Cells

    By F. Sawyerr

    A bubble population balance model is proposed for the prediction of Sauter mean bubble diameters in mechanical flotation cells. In the model, the flotation cell is treated as two separate, statistical

    Jan 1, 1998

  • NIOSH
    RI 8775 An Evaluation of Aluminum Smelter Potlining as a Substitute for Fluorspar in Cupola Ironmelting and in Basic Oxygen Steelmaking

    By Victor R. Spironello

    The Bureau of Mines has studied slags associated with ferrous melting, to evaluate substitutes for the auxiliary flux mineral, fluorspar. A waste material recovered from alumina reduction cells, "used

    Jan 1, 1983

  • CIM
    Operation and Improvements at the El Indio Roasting Facility

    By John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson

    "The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot

    Jan 1, 1999

  • NIOSH
    OFR-181-82 In-Place Leaching Of Uranium, Copper, And Evaporites

    By T. G. Carnahan

    In-place leaching is being actively utilized to extract uranium, copper, and evaporites from low-grade and difficult-to-mine ores. The purpose of this report is to discuss in-place leaching technology

    Jan 1, 1982

  • SAIMM
    Variance Propagation In Toll Smelting Operations Treating Multiple Concentrate Stockpiles

    By C. J. Cutler

    Metallurgical accounting for toll treatment smelters pose a number of challenges. Multiple feed stockpiles have to be accounted for as part of the monthly recovery estimation. Moreover, multiple metal

    Jan 1, 2006

  • AUSIMM
    Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 Cannington

    By M Bird, B Oats, M Sganzerla

    Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and

    Sep 7, 2015

  • SME
    T& UC Tunnel Demand

    TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study

    Sep 1, 2013

  • SAIMM
    The Impact Of Ore Characterization And Blending On Metallurgical Plant Performance

    By N. R. Williams

    Black Mountain, a polymetallic base metal mine located in the Northern Cape territory of South Africa has been blessed with high grade economic ore for many years. Now that the Broken Hill orebody is

    Jan 1, 2001

  • SAIMM
    An algorithm for quantifying regionalized ore grades - Synopsis

    We present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)

    Jan 1, 2008

  • ISEE
    Building the Bridge - Explosive Regulation and Application

    By Geraldine Woods

    I work for the State of Washington as an Explosives inspector. My paper will describe the mission of the Wa. State Dept. of Labor pertaining to explosives and the regulation of explosives in the State

    Jan 1, 2002

  • AUSIMM
    Hydraulic Stope Filling on the Golden Mine

    G. R. Compton (Gold Mines of Kalgoorlie (Australia) Ltd., Fimiston, W. A.) : In congratulating Mr. Hooker upon his resume of Mr Parry's paper I have in mind the fact that he carried out the resea

    Jan 1, 1965

  • AUSIMM
    Electroformed Gold from Gold Mine Solutions ù A New Approach to Gold Recovery

    Laboratory and pilot plant investigations aimed at recovering gold as an electroformed sheet from gold eluate and gold leach solutions and slurries are discussed. The electrolytic test work undertaken

    Jan 1, 2007

  • NIOSH
    RI 3431 House Movement Caused By Ground Vibrations ? Introduction (f084d160-37aa-4764-86e3-1d24b7a3ece2)

    By J. R. Thoenen

    For several years the Bureau of mines has been investigating the characteristics of ground vibrations produced by quarry blasts. Considerable basic information has been obtained in the course of this

    Jan 1, 1938

  • SME
    Sustainable mining operations with Atlas Copco’s products

    By L. Bergkvist

    "History can provide many answers with regard to what today’s mining industry looks like and how we got to where we are today. It has always been self-evident that safety has to be given the highest p

    Jan 1, 2011

  • NIOSH
    Propagation Of EM Signals In Underground Metal/Non-Metal Mines

    By Richard J. Mahany, Terry S. Cory

    This report describes the results of a measurement and analysis program to characterize wireless radio transmission in metal/non-metal mines over a wide frequency range from 0.2 - 1000 MHz and over a

    Jan 8, 1981

  • NIOSH
    Bleeder Systems In Underground Coal Mines

    By John E. Urosek, Dennis A. Beiter, William J. Francart

    In This Chapter [Designing bleeder systems Examining and maintaining bleeder systems Evaluating bleeder system effectiveness] INTRODUCTION Bleeder systems are that part of the mine

    Jan 6, 2006

  • NIOSH
    RI 3431 House Movement Caused By Ground Vibrations ? Introduction

    By J. R. Thoenen

    For several years the Bureau of mines has been investigating the characteristics of ground vibrations produced by quarry blasts. Considerable basic information has been obtained in the course of this

    Jan 1, 1938

  • DFI
    CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement

    By Fabrice Mathieu

    The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi

    Jan 1, 2006

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957