Search Documents

  • AUSIMM
    The discovery of the QTS Central ore system, CSA mine, Cobar, NSW, Australia

    By E Apaza, R Neumayr

    This paper aims to summarise the discovery of the QTS Central resource, a previously unidentified +1 Mt inferred resource that lies between two major CSA resource systems.The 1.7 Mt at 5.76 per cent C

    Sep 20, 2017

  • SAIMM
    Oxygen Activity Measurements In Simulated Converter Matte (e2a109c1-a92c-480a-aff7-b09fc199f5f7)

    By K. G. Tshilombo

    It should be possible to use an oxygen probe to follow iron removal during converting, if local equilibrium is established between iron in the matte and the iron oxides in the fayalitic slag. The oxyg

    Jan 1, 2007

  • SME
    Limestone Lithological Classification, Using Image Processing And Pattern Recognition Technique

    By F. Khorram

    Image processing is a technique that simulates the human vision system. This technique enables applying every statistical or intelligent operation to recognize differences. In this way this new techni

    Jan 1, 2012

  • SME
    Brij Moudgil: An Interview With the 2006 SME President

    Your assessment of the minerals business. I would first like to express our profound sadness and sincere condolences to the families of the miners who lost their lives in recent mine mishaps part

    Jan 1, 2006

  • AUSIMM
    Tecnical note-lineament guidelines to mine development: a continuing case history, northeastern Queensland

    LANDSAT imagery has renewed interest in linear features first recognised by E. S. Hills in a physiographic model of Australia. Certain of these lineaments are aligned with structures which control min

    Jan 1, 1986

  • AUSIMM
    Application of Lithostratigraphic and Chronostratigraphic Analysis to Seam Modelling in the Rapahoe Sector, western Greymouth Coalfield

    Seam correlation in the central Rapahoe Sector (Greymouth Coalfield) can be enhanced by detailed lithostratigraphy and chronostratigraphy. Rewanui Coal Measures are overlain comformably by lacustrine,

    Jan 1, 1996

  • SME
    On-Line Imaging Of Aggregates For Process Control

    By Michael Taylor, Thomas W. BoBo

    Currently two of the most important characteristics of construction aggregates are (a) the particle size distribution (psd) and (b) the “shape” of the aggregate particles. The long established test me

    Jan 1, 2005

  • AUSIMM
    Role of Physico-Mechanical Properties in Cutting Performance of Diamond Wire Saw in Marble Quarrying Operation

    Marble deposits of dolomitic variety are available in large quantities in India and for extracting these deposits diamond wire saw cutting machine is mainly used. Cutting performance of the diamond wi

    Dec 6, 2010

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • NIOSH
    RI 3443 Explosion And Fire Hazards Of Combustible Anesthetics - Introduction (42306d06-5952-4a18-9ba7-3e20f7cde6aa)

    By G. W. Jones

    As a part of its general safety program the Bureau of Mines has investigated various means useful for the elimination or mitigation of the explosion hazards in connection with combustible gases incide

    Jan 1, 1939

  • SAIMM
    Proceedings, 109th Annual General Meeting, 2006

    The 109th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 16 August 2006. Special

    Jan 1, 2006

  • SAIMM
    Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts.

    By D. M. Walters

    To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary cooling, must be provided. These requirements are considered for sinking vertical, sub-vert

    Jan 1, 2009

  • SAIMM
    Chromium distribution between slag and non-carbon saturated metal phases under changing partial pressure of carbon monoxide

    By X. Pan

    Slag-metal equilibrium experiments were conducted at 1500ºC and 1580ºC under 0.03 atm, 0.05atm and 0.83 atm CO partial pressures using silica and Cr-oxide crucibles. The complex slags belonged to SiO2

    Jan 1, 2004

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • SME
    Measurement and Analysis of Ground Movement and Load Redistribution at a Longwall Mine in Central Utah

    To gather additional field data from the western United States, researchers from the National Institute for Occupational Safety and Health (NIOSH) installed an array of field instrumentation at a long

    Jan 7, 2020

  • NIOSH
    RI 3443 Explosion And Fire Hazards Of Combustible Anesthetics ? Introduction

    By G. W. Jones

    As a part of its general safety program the Bureau of Mines has investigated various means useful for the elimination or mitigation of the explosion hazards in connection with combustible gases incide

    Jan 1, 1939

  • SAIMM
    Formation and stabilization of rock cavern roof arches

    By M. Lu, E. Broch

    Abstract: The formation and mechanism of rock cavern roof arches are studied and effects of rockbolts reinforcement are evaluated. It is concluded that a self-supported roof arch may be formed by the

    Jan 1, 2003

  • NIOSH
    RI 9332 - Evaluation of Ultrasonic Measurement Systems for Bolt Load Determinations

    By Stephen C. Tadolini

    The U.S. Bureau of Mines has developed ultrasonic measurement instrumentation capable of measuring strains and elongations on tensioned and untensioned mine roof bolting systems. This report evaluates

    Jan 1, 1990

  • AUSIMM
    Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine

    By M Nehring, E Topal

    Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a to

    Jan 1, 2009

  • IOM3
    Thermodynamic modelling of minor-element behaviour in in-bath copper smelting and converting with calcium ferrite slag

    By H. Y. Sohn, Hang Goo Kim

    Computer simulations were carried out using calcium ferrite slags containing 25 wt% CaO, and the results compared with those obtained using fayalite slags. There was little difference in overall elimi

    Jun 18, 1905