Search Documents

  • SAIMM
    Risk Analysis In The Mining Industry

    By R. Heuberger

    South Africa?s Mining Industry operates in an uncertain world. The industry is buffeted by problems regarding retrenchments, unemployment, low productivity, rising costs, volatile exchange rates, comm

    Jan 1, 2005

  • AUSIMM
    Effective Mine Planning on a Microcomputer

    Tougher physical mining and processing conditions as well as economic circumstances are causing many mining companies to re-evaluate the effectiveness of their mine planning. The recent wave of ine

    Jan 1, 1989

  • SME-ICGCM
    Pillar Reinforcement or Rib Support?

    By André C. Zingano

    The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com

    Jan 1, 2006

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007

  • SAIMM
    Dimensioning of Tunnels in Swelling Rock

    By P. Wittke-Gatterman

    ABSTRACT: A three dimensional constitutive law for swelling rock is presented. It can be applied to the osmotic swelling of mudstone as well as to the swelling of rocks containing anhydrite. It descri

    Jan 1, 2003

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980

  • SME
    In Situ Leaching Of Uranium: History, Technology And Economics

    By T. C. Pool

    Physical and chemical conditions permitting, in-situ leaching (ISL) of uranium offers a variety of advantages over conventional production methods including less surface disturbance and less solid was

    Jan 1, 2000

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • AUSIMM
    Stirred Milling Technology - A New Concept in Fine Grinding

    By A Paz, H Lehto, M +stholm, I Roitto

    Nowadays, the demand for a finer grind in minerals processing has set new challenges within the industry, particularly for grinding technology. Apart from a finer grind, energy efficiency is also a ke

    Jul 15, 2013

  • NIOSH
    OFR-56-80 Characterization Of Respirable Coal Mine Dust Computer Analysis Of Scanning Electron Microscope Images

    By Gerald G. Johnson

    The use of the Scanning Electron Microscope to characterize Coal Mine Dust has been possible because of two circumstances. First, the imaging process of the SEM allows multiple signals (secondary elec

    Jan 1, 1979

  • AUSIMM
    Deep Sea Tailing Placement - Water Quality Impacts

    By P To, A Sharp-Paul, S Jones, C Monahan

    A key environmental management issue associated with mining projects is tailing disposal. In high rainfall environments this is particularly challenging and generally requires the discharge of excess

    Jan 1, 1999

  • SME
    Research And Engineering Solution For Dump Tuck Vibration Problems In High-Impact Shovel Loading Operations

    By N. Aouad

    The deployment of large machinery for low cost, bulk surface mine production operations has resulted in high-impact shovel loading operations (HISLO). In extreme cases, shovels load large dump trucks

    Jan 1, 2011

  • AUSIMM
    Presidential Address, 1956

    Before presenting this address I desire to express my appreciation of the honour which has been conferred on me by my election as iPresident of The Australasian Institute of Mining and Metallurgy. At

    Jan 1, 1956

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • IIMP
    Aplicación del sistema SAP en minería subterránea

    By Efrén Peña Pino

    El presente texto señala la aplicación del sistema SAP en la minería subterránea de Minsur. Este sistema operativo maneja las propiedades y procesos de la Sociedad Minsur, el cual cuenta con tres Cent

    Jul 31, 2003

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Occupational Standards and Certification for Mineral Processing Technicians in the Northwest Territories

    By Mary Ann Bennett, Val Nichols, Colleen Proctor

    "In 1997 when Royal Oak Mines Inc. went into receivership, the mineral processing technicians (mill operators) who had been working at Giant Mine in Yellowknife, Northwest Territories for most of thei

    Jan 1, 2005

  • SME
    Risk Management of the Canada Line Transit Tunnels ? Introduction

    By Brendan Henry

    The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a

    Jan 1, 2008