Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Prevention. Control and Management of Coal and Gas Outbursts

    By Lu Jiam Zhang

    Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di

    Jan 1, 1987

  • SME-ICGCM
    New Design Criteria for Roof Bolt Systems

    By John C. Stankus

    From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in

    Jan 1, 1997

  • SME-ICGCM
    Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled Stope

    By Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen

    "As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.

    Jan 1, 2018

  • SME-ICGCM
    Considerations for Effective Ground Support in Evaporites

    By C. A. Vining, J. R. Nopola

    "Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can

    Jan 1, 2018

  • SME-ICGCM
    Remote Mining Using Water for Ground Support

    By Robert L. Schmidt

    The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result

    Jan 1, 1986

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Using Foaming Grout to Stabilize a Ventilation Raise in Very Poor Rock

    By John Magyar

    Special foamed cements were used to stabilize and secure caving ground in a newly-reamed 12.5-ft diameter underground ventilation raise. Two zones of very poor Rock Mass Rating (RMR) material were enc

    Jan 1, 2005

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Mobile Roof Supports For Pillar Retreat Mining

    By Robert P. Kudlawiec

    The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th

    Jan 1, 2000

  • SME-ICGCM
    Aerostatic Support System For Underground Coal Mines

    By R. J. Morrell

    The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra

    Jan 1, 1988

  • SME-ICGCM
    Yielding Cement Roof Supports for Longwall Mining

    By Alan A. Campoli

    Fosroc continues as a leader in the development of cementitious technology for the mining industry. The considerable expertise accumulated in the development of the Fm cement line has been employed in

    Jan 1, 1997

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993

  • SME-ICGCM
    Site Characterization For Planning Underground Stone Mines

    By Francis S. Kendorski

    Underground stone mines tier construction aggregates and industrial minerals are being planned in increasing numbers throughout the United States. At the middle of the last century (1950s) underground

    Jan 1, 2000

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • SME-ICGCM
    Use Of Polymer Grids For Longwall Shield Recovery

    By Brian E. Travis

    The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers

    Jan 1, 1990

  • SME-ICGCM
    Expanded Cement: New Solutions for Age-Old Problems

    By John K. Wood

    The development of an expanded cement product represents a major advance in the technology of roof control systems. Such a product is gaining recognition as a valuable tool in today's cost- consc

    Jan 1, 1986

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Application of Tensioned Cable Bolts for Supplemental Support

    By Ben Mirabile, Alan Campoli, Rodney Poland

    "The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca

    Jan 1, 2010