Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder Entries
By William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri
Jan 1, 2017
-
Evaluation of Drill Hole Geometry on Bolted Roof Beam Performance
By David R. Burkhard
"Comparative roof beam performance, as measured by delamination within the bolted horizon, was used to evaluate two types of roof bolt drill hole geometries in a development setting. Short encapsulati
Jan 1, 2016
-
Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts
By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig
"The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C
Jan 1, 2015
-
Rock Characterization Using Time - Series Classification Algorithms
By Soheil Bahrampour
Development of measurement while drilling (MWD) systems for ground control applications in mining applications has recently been an active research topic. The main goal is to utilize the drilling info
Jan 1, 2014
-
Barrier Pillar Design for Safe and Productive Longwall Mining
By Stephen C. Tadolini
Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use
Jan 1, 2013
-
Geotechnical Monitoring of Rock Mass and Support Behaviour around the UCG Georeactor: Two Case Studies in Polish Coal Mining Industry
By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Sylwester Rajwa, Aleksander Wrana
"Underground coal gasification (UCG) provides a solution to supply electricity from high ash coal or deep deposited seams. The coal is consumed in situ, and, accordingly, the ash is left underground.
Jan 1, 2017
-
System Behavior of Roof Bolt Systems with Varying Bearing Plate I Angle Compensating Device Combinations
By Gregory E. Smith
"Tensionable headed roof bolt systems are common in the U.S. mining industry. In the last 15 years or so, they have made a comeback as a hybrid system where a mechanical anchor is used in conjunction
Jan 1, 2016
-
Upwards Surface Movement above Deep Coal Mines after Closure and Flooding of Underground Workings
By Pierre-Yves Declercq, Andre Vervoort
"After the mass closures of entire coal mine districts in Europe at the end of the last century, a new phenomenon of surface movement was observed—an upward movement. Although most surface movement (i
Jan 1, 2017
-
Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)
By P. A. Gray
Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c
Jan 1, 1992
-
Mine Design Considerations For Surface Subsidence Control
By John L. Edwards
The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment
Jan 1, 1993
-
A Holistic Examination of the Geotechnical Design of Longwall Shields and Associated Mining Risks
By Russell C. Frith
This paper examines the design of longwall shields, focusing on those aspects that are critical to either their successful application or contribution to failure during longwall extraction. In many i
Jan 1, 2013
-
Study on Eco-Friendly Underground Mining System for Ultra-Thick Coal Seams in Thailand
By Takashi Sasaoka
EGAT Mae Moh Lignite Mine in Thailand produces about 16 million tons of lignite annually from open-cut mining. The coal is used to generate 2,400 MW of electricity. In the near future, however, the co
Jan 1, 2011
-
A Case Study of Topography?Related Stress Rotation Effects on Multi?seam Stability
By Ihsan Berk Tulu
The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi
Jan 1, 2014
-
Whole-Mine Subsidence over Tabular Deposits and Related Seismicity
By William G. Pariseau, Michael K. McCarter
"The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc
Jan 1, 2016
-
A Rock Mass Strength Concept For Coal Seams
By George S. Kalamaras
Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down
Jan 1, 1993
-
Mechanism and Prediction of Ground Surface Subsidence Due to Multiple-Seam Longwall Mining
By Gang Ren, Behrooz Ghabraie
"Observational data suggest that the ground surface subsidence profile from multiple-seam longwall mining is rather different from that of single seam. Despite the increase of coal production from mul
Jan 1, 2016
-
Development of An Enhanced Methodology for Ground Movement Predictions Due to Longwall Mining in the Illinois Basin
By Zach G. Agioutantis
The Illinois Basin has an extensive history with the use of mechanized longwall mining dating back to the early 1970?s. In recent times, technological advances have resulted in increased panel widths
Jan 1, 2014
-
Panel?scale Modeling of a Deep Longwall Panel: the MULSIM Alternative
By Mark K. Larson
Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the
Jan 1, 2013
-
Challenges of Room and Pillar Mining at 900 M Depths in the Czech Republic
By William J. Schloemer
INTRODUCTION The history of coal mining the Ostrava Region of the Czech Republic goes back nearly 250 years. Both coking coal for steelmaking and thermal coal for the production of energy are mined h
Jan 1, 2014
-
Roof-Pillar Interface Affecting the Pillar Behavior
By Andre Cezar Zingano
"The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng
Jan 1, 2016