Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Decision Support System For Underground Construction - A Mining Case StudyBy Robert M. Miller, Judy Milligan
A computerized "Decision Support System" was used to evaluate an "Underground Platform Approach to Oil Recovery". Over a billion calculations were required to model the mine layouts; learning curves f
Jan 1, 1987
-
Use Of The 1500-pDR For Gravimetric Respirable Dust Measurements At MinesBy W. R. Reed
The National Institute for Occupational Safety and Health (NIOSH) uses light-scattering dust monitors (nephelometers) in its research to develop dust controls to reduce respirable silica dust overexpo
Jan 1, 2012
-
Successful Application Of Remote Seals Used To Extinguish A Coal-Mine FireBy D. Bour, C. Nyikos, R. Curtice
Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti
Jan 1, 2002
-
Tunneling Data: Turning Information into Intelligence on the NEIS ProjectBy John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Presentation Of Particle Beneficiation Test Results On An Equal Basis When Yield And Recovery Are InvolvedBy J. Drzymala
Particle beneficiation tests are often conducted to determine how the recovery of a key component of a particle mixture varies with overall product yield, i.e., the separation curve. The results can b
Jan 1, 2007
-
Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam MiningIn order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars
Jul 28, 2020
-
Strong reserve bases are key to oil companies surviving over the long-termBy Wilfred P. Schmoe
Introduction An integrated oil company has two options in approaching strategic planning. It has to decide whether it is in business for the long-term. I state this in all seriousness. Those who help
Jan 6, 1985
-
Tracer Gas Techniques For Mapping Air And Methane Migration Through A Longwall Waste In An Underground Coal Mine Using Tube Bundle SystemsBy G. W. Bonnell, D. A. Young, D. G. Genter
Through 1996 and 1997, CANMET and the Cape Breton Development Corporation (CBDC) conducted a project to study the Phalen Mine’s 7 East longwall ventilation network to help determine methane emission p
Jan 1, 2001
-
Environmental Impact Of Digging And Loading Equipment In Surface Coal MiningBy A. Lashagri
This paper presents research results on assessment of environmental impact of digging and loading equipment in surface coal mining. Environmental impact is accessed through the equipment exhaust and d
Feb 27, 2013
-
Using Administrative Controls to Reduce Tailings – Dam RiskBy G. H. Glos
There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today
Jan 1, 1999
-
Instrumentation Plan For Monitoring Ground Movements Associated With Pillar Extraction Mining At The Kitt No. 1 Mine In Northern West VirginiaBy Robert C. Speck
The U.S. coal industry has long utilized the pillar-extraction mining technique as a method for maximizing coal recovery. Like longwall mining, it causes large-scale movements that progressively propa
Jan 1, 1982
-
SelectionConsiderations - Using a ConsultantBy Alfred Weiss
Selecting a minicomputer is not unlike selecting a costly piece of mining equipment such as a truck, shovel, crusher, or conveyor belt system. A marked difference might lie in the frequency at which s
Jan 11, 1981
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
A protocol and standard for mine ventilation studiesFlawed mining studies have been major contributors to poor investment decisions in mining for many years, contributing to the long period of poor industry profitability. Most of the major mining house
Jan 1, 2009
-
Weathering of freshly exposed sulphides at the Arctic Mid-Ocean RidgeBy Rolf B. Pedersen, Ana Filipa Marques, Ingunn H. Thorseth, Ingeborg Okland
"Deep sea mining of polymetallic sulphides will change the physical and chemical conditions at the seafloor by creating scars when sulphides are removed, and potentially also by deposition of mine tai
Sep 1, 2014
-
Newmont Cuts Costs and Increases Reserves at CarlinBy Bruce D. Hansen
For many years, Newmont has focused on improving its operations. After the merger between Newmont and Santa Fe Pacific Gold, Newmont created synergies of more than $50 million a year in Nevada. This
Jan 1, 1999
-
An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern OntarioBy Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey
Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter
Jan 1, 2007
-
A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi CrossingBy Chester M. F. Peters
The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first
Jan 1, 1997
-
Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.By V. Galla
Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding
Jan 1, 2011