Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock mechanics program helps improve trona recovery at Stauffer’s Big Island mine in WyomingBy R. V. Hunter, J. F. T. Agapito
Introduction Significant increases in extraction ratio on the order of 6% to 8%, equivalent to as much as 142 t/m (48 st per ft) of panel, have occurred at the Big Island trona mine during the last f
Jan 1, 1989
-
MECHANICS OF JOINTED ROCK MADE EASY - SME Annual Meeting 2023By W. G. Pariseau
Joints may be taken into account when using numerical modeling as an aid to mine design by embedding joints in the model. When using the popular finite element method, say UT3PC, a pre-analysis step i
Feb 1, 2023
-
Discrete Fracture Network Modeling In Support Of In Situ Leach MiningBy Bill Dershowitz
Consider a deep gold orebody with grade of 4 g/t (0.11 oz/st). At the time of this writing, with gold prices at historic highs, it could be a good, but not great, prospect. But if it is a vein deposit
Jan 1, 2011
-
Examinations. Valuation And ReportsBy James Donald Forrester
JAMES DONALD FORRESTER 32.1-EXAMINATIONS The field examination of a mineral deposit or mining enterprise requires a comprehensive effort to determine all natural and man-made factors bearing upo
Jan 1, 1973
-
A New Approach Of Dewatering Fine Mass ProductsBy W. H. Stahl
The continuous vacuum filtration is the solid-liquid separation process that is nowadays most frequently used in the beneficiation industry all over the world. After a development time of several dec
Jan 1, 1983
-
Copper Recovery From Concentrated Solution Utilizing Kelex Solvent Extraction ? IntroductionBy J. A. Hartlage
Four years ago, Ashland Chemical Company introduced a new copper solvent extraction reagent for hydrometallurgical utilization. The reagent, an alkylated 8-hydroxyquinoline, is called Kelex 100 ®(1).
Jan 1, 1974
-
Innovative Directional Controlled Blasting Technique for Excavation of Unstable Slopes Along a Busy Transportation Route: a Case Study of Konkan Railway in India Mining, Metallurgy and Exploration (04f70e1b-6daa-4a15-a03f-f701f02b279c)By Aditya Rana, A. K. Mishra, M. M. Singh, N. K. Bhagat
Many cases of derailments, train accidents and traffic interruptions due to the slope failure and rockfall have been reported in the past on Konkan Railway trackline because of unstable rock slopes. T
-
Monitoring and Data Management Challenges at the Metro Project Cityringen CopenhagenBy Klaus Rabensteiner, Klaus Chmelina
"INTRODUCTION Urban tunneling is often related with special geotechnical risks. Typical causes are difficult (hydro)geological conditions, a very low overburden and the presence of critical and vulner
Jan 1, 2016
-
Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg
INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130
Jan 1, 1982
-
The Flotation Limit Of Fine Particles Based On Contact Angle MeasurementsBy J. Drelich
The flotation limit of fine particles has been re-examined based on the effect of bubble size on contact angle, and a new surface chemistry-limited relationship describing the minimum particle size wh
Jan 1, 1994
-
Tube bundle system for monitoring of coal mine atmosphereBy Karl R. Zipf
A tube bundle system (TBS) is a mechanical system for continuously drawing gas samples through tubes from multiple monitoring points located in an underground coal mine. The gas samples are drawn via
May 1, 2013
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Technical Review Of Mine DevelopmentBy D. Tolgyesi, L. P. Gignac
Mine development has evolved in the past 15 years from a human-paced system using hand-held drills and track-bound equipment to a mechanized system using specialized equipment for each component of th
Jan 1, 1983
-
An Empirical Model for Accurate Prediction of Yield Stress by Slump Flow Based on a Mini‑cylindrical Mold - Mining, Metallurgy & Exploration (2023)By Aixiang Wu, Minjie Zhang, Zhuen Ruan, Yiming Wang
This paper combines theoretical and experimental analysis to conduct relevant research to improve the accuracy of predicting paste yield stress by slump flow. The analytical model of slump flow for yi
Jun 1, 2023
-
Flow Of Bulk Solids - Progress Report ? IntroductionBy Andrew W. Jenike
The first significant studies of problems related to the handling and storage of bulk solids were reported at the end of the nineteenth century. Early work originated from the necessity to store large
Jan 1, 1959
-
Operation Of The Grate-Kiln System At Humboldt IntroductionBy Dan Urich
This paper covers the construction and operation of the Grate-Kiln system at the Humboldt Mine. The mine concentrator and pellet plant are located approximately 14 miles West of Ishpeming, Michig
Jan 1, 1962
-
Continuous Manufacture Of Coke In A Rotary Hearth FurnaceBy Josh B. Taggart
Some twenty to twenty-five years ago we saw the beginning of mechanization in our coal mines, It has now progressed to the point Chat as instruments of production the pick and shovel are things of the
Jan 1, 1962
-
Jackleg Drill Usage and AccidentsBy C. Clark, J. Seymour, D. Benton
"National Institute for Occupational Safety and Health NIOSH is conducting research on jackleg use and related accidents in underground metal mines. This paper provides an analysis and overview of jac
Jan 1, 2016
-
An Airborne EM (Input)/Magnetometer Survey, State Line District, Colorado ? Wyoming - IntroductionBy Norman R. Paterson
In November 1980 a combined airborne electro-magnetic (INPUT.) and magnetometer survey was conducted by Questor Surveys Limited in the State Line Area, Colorado-Wyoming. The survey was the result of d
Jan 1, 1984
-
TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024