Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada

    By Dean Brox

    The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop

    Jan 1, 2008

  • SME
    Big Hole Drilling -- The State Of The Art

    By M. D. Lackey

    The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being

    Jan 1, 1983

  • SME
    Geochemical Profiling Of A Sulfide Leaching Operation: A Case Study

    By S. M. Flaherty, R. E. Scheffel, A. Guzman

    Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me

    Jan 1, 2006

  • SME
    Sales Comparison Valuation Of Development And Operating Stage Mineral Properties (35d10c9f-1d98-4437-8650-1c6154123f45)

    By T. R. Ellis

    Minerals Appraisers/Valuers often find great difficulty or failure in attempting to employ the Sales Comparison Approach to the Market Value Appraisal of development and operating stage mineral proper

    Jan 1, 2011

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • SME
    In-Mine Evaluation Of Smart Mine Fire Sensor (e0413569-6dc4-41a0-bd26-5c60fdfe0934)

    By R. A. Franks

    An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system?s ability

    Jan 1, 2008

  • SME
    Influence of Rock Mass Properties on Performance of Hard Rock TBMs

    By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh

    Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec

    Jan 1, 2005

  • SME
    Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction

    By I. Ocak

    Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme

    Jan 1, 2011

  • SME
    The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active mining

    By S. J. Schatzel

    In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO

    Jan 1, 2009

  • SME
    Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines

    By S. E. Phillipson

    During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t

    Jan 1, 2006

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    Drilling And Lining Of The Ocean Shafts - Seabrook Power Project

    By B. J. Dave, Ashok J. Desai, Allen J. Hulshizer

    This paper presents various design and construction considerations involved in developing an underwater installation of lined, large diameter shafts not known to have been previously accomplished for

    Jan 1, 1976

  • SME
    Technology News – Atlas Copco Introduces Hydraulic Breaker

    The HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn

    Jan 1, 2006

  • SME
    Maintenance Contract on Cat 785 Trucks Works Well at Round Mountain

    By J. B. Rasmussen

    As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle

    Jan 1, 1991

  • SME
    Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy Construction

    By Peter J. Tarkoy

    A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and

    Jan 1, 1983

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • SME
    Selective Flocculation Of Fine Phosphate Materials (8c939b54-ad68-4cf0-a2e6-037610cedf74)

    By H. Sis, D. Dahlin, S. Chander, C. Summers

    Bench-scale selective-flocculation tests were conducted on samples of Florida and Western phosphate process tailings. Physical, mineralogical, and surface characteristics were determined for both typ

    Jan 1, 2002

  • SME
    Record Production Of Industrial Rocks And Minerals In Utah

    By B. Tripp

    Utah produces a wide variety of industrial rock and mineral commodities, valued in 2005 at a record $758 million (21 percent of the total non-fuel mineral production of Utah). Major commodities produ

    Jan 1, 2007

  • SME
    What it’s worth : A review of mineral royalty information

    By H. Lyn Bourne

    This is the fourth annual tabulation that gives mineral royalty information. The table presents previous information plus about two dozen new entries. In addition to the royalty information, some entr

    Jan 8, 1986