Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Crater Blasting Techniques and Designs in Compacted Soils
By Patrick D. McLaughlin
Crater blasting techniques have had relatively little application in the surface mining industry. This is not surprising, considering the geometry required to efficiently use cratering. The more widel
Jan 1, 1992
-
Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study
By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody
Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex
-
Quarry Blast Permitting in the Urban Environment
By Chris Breeds, Ken Johnston, Omar Fulton
This paper describes the process typically involved with obtaining permits for quarry blasting in urban, suburban, and rural areas, including: content of SEPA (State Environmental Policy Act) driven d
Jan 1, 2003
-
Blasting Seismograph Comparison in Side-by-Side Blast Monitoring Tests
By Kenneth Eltschlager, Jim Ratcliff, Michael Mann, Edward Sheehan
The Appalachian Blaster Certification Delegation initiated a study to compare the consistency of measurements from blasting seismographs. Six blasts were monitored at surface coal mines in West Virgin
Jan 1, 2015
-
Subdrill – The Underutilised Blasting Parameter
By Stephen Mansfield
In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable
-
International Society of Explosives Engineers and the Explosive Industry
By Jeffery L. Dean
Founded in 1974, the ISEE has grown to more than 3600 members representing 72 countries. The Society and its 35 chapters in the US, Canada and Australia promote research and education, provide forums
Jan 1, 1997
-
Bulk Explosives Loading and Delivery Systems Including Economics
By Brian Gar Wingfield
Bulk explosive systems have developed from the infancy stages in the early sixties to a sophisticated process of the nineties. With ever changing bulk explosives technology, bulk delivery and loading
Jan 1, 1991
-
600 000 M.T to move, a High Risk Operation
By Jean-Sébastien Lambert, Serge Roberge
"At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their
Jan 1, 2016
-
Evaluation and Selection of Blasthole Drilling Equipment Based on Application and Overall Cost
By George D. Raitt
Anyone who has spent any time in and around the drilling and blasting profession knows that probably the most critical part is the drilling portion. A blasthole is nothing more than a cylindrical vehi
Jan 1, 1990
-
Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager
By Steve Dillingham
Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m
Jan 1, 2001
-
Determination of the Dynamic Uniaxial Tensile Strength of Laurentian Granite Using an Explosivesly-Impacted Hopkinson Pressure Bar
By P D. Katsabanis
The dynamic tensile strength of geomaterials is known to be highly dependent on the strain rate of the load applied. This is significant in applications where the material is subjected to shock waves
Jan 1, 2010
-
Blast Design for Vibration Control in Construction Blasting
By Terra Dinamica, Frank Lucca
This paper discusses blast design for vibration control in tight construction blasting. Topics include blast pattern geometry, blast design formulas, loading, explosives & initiation selection, and ut
Jan 1, 2005
-
Modeling Vs. Monitoring Blast Movement: The Cost of Variation
By Will Hunt, Darren Thornton
In March of 2013, an undisclosed gold mine (MINE X), located in the Western United States, performed blast movement monitoring of three blasts occurring in one of two active pits. Blast Movement Monit
Jan 1, 2014
-
Digitized, Integrated and Optimized Drill and Blast
By Sushil Bhandari, Amit Bhandari
Drilling and Blasting are core operations in a mine. They impact all the downstream operations and their costs. Digital technologies exist for optimizing both drilling and blasting for many years. How
-
A Practical Approach to Managing Control of Flyrock
By Simon St. John Tose
We have had a long history in supporting the development of training material to ensure “safe” blasting. This has been provided as both significant technical guidance to the industry and input into th
Jan 1, 2013
-
A Model for Near and Farfield Blast Vibration Based on Multiple Seed Waveforms and Transfer Functions
By D. Scott Scovira, Ruilin Yang
Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field
Jan 1, 2010
-
Underwater Explosions - Particle Size Effect of Al Powder to the Energy Content of PBX
By Martti Hagfors
Underwater explosions have been used as a test method for the determination of energy content of explosives for several decades. This is the only test method by which shock, gas heave and total energy
Jan 1, 2009
-
Blast Vibrations: A Critical Component of Dilution Control at an Underground Mine
Blast vibration analysis under relatively near-field conditions has been carried out in a narrow-vein underground operation. The objective was to characterize the vibration signal (particle accelerati
Jan 1, 2003
-
Blasting Program Optimization with Emphasis on the Control of Blast Vibration and Airblast
By Frank Sames
Most Blasting Programs are developed focussing on the environmental impact with respect to blast vibration and airblast. Compliance with existing regulations or policies limiting the immissions are ge
Jan 1, 2000
-
"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"
By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016