Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Near-field Blast Vibration Response of Sensitive Pipelines

    By C. Sawmliana, P. Pal Roy

    Near-field blast vibration response of restrained pipelines either buried or exposed was studied during rock excavations at sensitive locations for Stage-II (4x500 MW) commissioning work in a super th

    Jan 1, 2001

  • ISEE
    Field Studies of CO Migration from Blasting

    By Richard J. Mainiero, Michael J. Sapko, Marcia L. Harris

    Since 1988, there have been thirteen documented incidents in the United States and Canada in which carbon monoxide (CO) is suspected to have migrated through near surface strata into structures or oth

    Jan 1, 2005

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • ISEE
    Underwater Blasting: A Summary

    By Joshua Taylor Drake

    This report answers specific questions concerning underwater blasting considerations, and blasting safety. The blasting considerations discussed consist of basic blasting principles, and new variables

    Jan 1, 2015

  • ISEE
    The Journal of Explosives Engineering - Vol 21 No 2 - Dynamite Daze

    I had the opportunity recently to visit a magazine site of a major explosives company. It was fun to see the storage areas again and it was really interesting to see one of the old magazines that prob

    Jan 1, 2004

  • ISEE
    Estimation of Rock Fragmentation in Bench Blasting Using Numerical Simulation

    By Sang Ho Cho, Masaji Kato, Masaaki Yamamoto, Masaaki Nishi, Katsuhiko Kaneko

    This paper presents a numerical simulation method to predict rock fragmentation and to verify a fracture mechanism by bench blasting. The rock fragmentation, which has been used as a means of the inde

    Jan 1, 2002

  • ISEE
    Explosively Loaded Vessel for Dynamic Experiments at Advanced Photon Source

    By Christian J. Sorensen, Christopher Armstrong, Andrew Matejunas

    A team consisting of junior and senior mechanical engineering students at New Mexico Tech worked on the design of an explosively loaded vessel, with a maximum load of 15 grams (0.53 oz) TNT equivalent

    Jan 1, 2015

  • ISEE
    Changing the Landscape of Surface Mining through Fully Wireless Initiation Systems

    By Nolan Eckroade, Nigel Pereira

    Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly

  • ISEE
    Within a Stones’ Throw

    By James Goldberg, Mark Withey

    The Material Service Thornton quarry is a multi-million annual production tons complex. Surrounded by busy surface highways, and divided by a railroad on the north/south axis and further divided by a

    Jan 1, 2006

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • ISEE
    200 Blasting in the New Millennium - The Cold Hard Facts About Winter Driving for Blasters

    By Ann Barron

    For millions of people, cold weather is a fact of line – and one that can make a major challenge out of just getting to work. But for those working in the blasting industry, a number of obstacles are

    Jan 1, 2004

  • ISEE
    Portable Continuous Velocity of Detonation Systems

    By Jackson R. Pressley, M L. Hopkins, R E. Danell, N T. Moxon, Andrew Bowman

    Efficient and cost effective blasting is achieved by closely matching the explosive energy to the strength of the material in which it is being used. Although there are many empirical relationships wi

    Jan 1, 1991

  • ISEE
    Application and Economics of Overburden Casting: Can it Work for You?

    By Conny Postupack

    To make money in mining coal you have to sell it for a lot more than it cost you to get it out of the ground. And yet, every year it cost us more and more to stay inbusiness, while the price we get fo

    Jan 1, 1990

  • ISEE
    Comparison and Validation of Computational Mine Blast Loading

    By R. Reed Skaggs, William Gault, Douglas Kooker

    Both armored personnel carriers and light combat vehicles are increasingly vulnerable to a variety of highly lethal antitank land mines. As a result, there is a need for modeling and understanding the

    Jan 1, 2005

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013

  • ISEE
    Blasting Effects on Pore Pressure in Coal Impoundments (Dry Conditions - Part I)

    By Joshua Micah Hoffman, Jhon Silva-Castro, Kylie Larson-Robl

    A coal mine impoundment failure has the potential to be environmentally devastating and life-threatening. It is well documented that after seismic events slope failures in impoundments can occur. It h

    Jan 1, 2015

  • ISEE
    High Performance Throw Blasting with i-kontm Electronic Detonators in an Environmentally Sensitive Area at Stratford Coal, NSW, Australia.

    Henry Walker Eltin (HWE) are the mining contractors for Gloucester Coal at Stratford mine, which is in an environmentally sensitive area in the Avon Valley, NSW, Australia. Normal blasting at Stratfor

    Jan 1, 2003

  • ISEE
    Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation

    By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff

    Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co

    Jan 1, 2012