Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago
By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis
By Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant
By Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt
By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava
By J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban Areas
By Paolo Cavalcoli, Marco Ziller
"ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th
Jan 1, 2014
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers
By Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil
By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Soil Grouting to Arrest Foundation Settlement
By Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction
By W. J. van Niekerk
Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st
Jan 1, 2000
-
Development of a New, Advanced form of Sodium Silicate for Chemical Grouting
By Julie Shang, Tim Evans, Michael McDonald, Yu Guo, Bingfeng Xue
Effective chemical grouting represents a technical and economic solution to many challenges related to soil stabilization and blocking the flow of water. Chemical grouts are facing increasing demands
Jan 1, 2018
-
Modern Procedures For The Design Of Driven Pile Foundations
By G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
Creative Shoring Solutions For A Tight Urban Site
By David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Innovative Construction Techniques Used At North Shore Construction Project
By Kanchan K. Sen
The North Shore Connector (NSC) project will extend the Allegheny County Port Authority?s Light Rail Transit System from downtown Pittsburgh below the Allegheny River to the North Shore via twin bore
Jan 1, 2010
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular Soil
By B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Design Of Cooper River Bridge Foundations
By Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Hydraulic Impact Pile Hammers ? Background
By Patrick Bermingham
The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes
Jan 1, 1987
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation
By Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques
By Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008