Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stope development for raise mining at the Namew Lake mine

    By D. Madsen, B. Salamondra, A. Moss, D. Etienne

    "Raise mining at the Namew Lake Nickel Mine in Manitoba uses 3 m diameter bored raises driven at 45 to 50 degrees dip for stope access and drilling. These raises are developed within the orebody on 20

    Jan 1, 1991

  • CIM
    Testing of Pyromag TM for Energy Efficient Hot Magnetic Seperation

    By Ian Sherrell, Michael Pirie, Riddhika Jain

    "Conventionally, direct reduced iron (DRI) mixed with char from rotary furnace discharge is cooled down before separating the char via magnetic separator. The DRI must then be reheated for further dow

    Jan 1, 2016

  • CIM
    A material balance calculation procedure for grinding circuit hydrocyclone selection

    "Process specifications for classification system design f or closed circuit grinding are identified. A computer-assisted, mass balance procedure for estimation of material size distributions and requ

    Jan 1, 1984

  • CIM
    Interpreting Core Data and Rock Quality Information for Stope Design

    Stope performance and geotechnical information at Xstrata Zinc George Fisher Lead-Zinc-Silver mining operations have been analysed in detail since the beginning in October 2003. This work has been inc

    Apr 1, 2005

  • CIM
    Logistic model applied to geophysical data for sulphide nickel exploration

    By R. Simard

    "Conventional exploration strategies identify many mineral deposits as potentially interesting, although only a few of them turn out to be of economic importance. In the context of exploration for sul

    Jan 1, 1980

  • CIM
    Mass flow prediction for reagent control at Les Mines Selbaie

    By Robin Perry, Claude Bazin

    "Discrete transfer functions which use the grinding circuit feed tonnage to predict mass flowrates at reagent addition points in a flotation circuit were calibrated using a dynamic grinding/flotation

    Jan 1, 1994

  • CIM
    The Sept-Iles Beneficiation Complex-An Extended Start-Up

    By C. H. Sleeman

    "The Iron Ore Company of Canada constructed a beneficiation complex in Sept-Iles, Quebec, to concentrate and pelletize earthy red hematite iron ores from the Knob Lake area. The plants were scheduled

    Jan 1, 1976

  • CIM
    Ceramics for the continuous casting of small cross section products

    By N. A. McPherson, P. C. Stevens, A. J. Rigby

    "There has been a consistent move in recent years to continuously cast small billets while utilizing ceramic stream protection between tundish and mould. The need to have ceramic stream protection has

    Jan 1, 1990

  • CIM
    Highly Efficient Gold (I) Complex Catalyst for Hydration of Alkynes

    By Eiichiro Mizushima

    Catalyst systems comprising (Ph3P)AuCH3 and acid co-catalysts were found to be highly efficient for hydration of alkynes to give ketones. Methanol was the best choice of solvents. Introduction Hydra

    Oct 1, 2003

  • CIM
    Hyperspectral Remote Sensing Characterization of Mine Materials for Process Control

    By Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton

    Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re

    Jan 1, 2019

  • CIM
    Environmental and Occupational Hygiene Considerations for High-Arsenic Metallurgical Testwork

    By H. Ardehali, P. Lind

    Many gold deposits also contain significant quantities of deleterious elements such as arsenic. Several biological pathways are possible for arsenic exposure; special care and caution must be used whi

    Jan 1, 2014

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    La Corne Molybdenite Deposit

    By G. W. H. Norman

    "The La Corne molybdenite-bearing veins, discovered in 1915, lie halfway between Amos and Val d'Or near the southwest corner of La Corne township, Abitibi county, Quebec. The Molybdenite Reduction Com

    Jan 1, 1954

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Re-Thinking Underground Hard Rock Mining

    By Alex Henderson

    The underground hard rock mining industry has had little change since the mobile equipment era began in the 1970s. Equipment has become larger and faster but has not kept pace with the following chall

    May 1, 2011

  • CIM
    Transportation of Gravel for Back-Fill by Branch Aerial Tram

    By W. F. J. Cosser

    AN agreement having been arrived at in 1935 whereby McIntyre Porcupine Mines would purchase gravel for back-filling purposes from Hollinger Consolidated Gold Mines, the aerial gear as described below

    Jan 1, 1938

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    An Integrated 3D GIS Model of the Yellowknife Camp: A Tool for Efficient Development

    By Garth D. Kirkham, James P. Siddorn, Hendri Falck

    "Abstract - As an integral part of the Geological Survey of Canada’s EXTECH III Project, a threedimensional computer model has been created of the Con and Giant gold mines in the Yellowknife Greenston

    Jan 1, 2003

  • CIM
    Regional-Scale Paleoclimate Influences on a Proposed Deep Geologic Repository in Canada for low and Intermediate Level Waste

    By S. D. Normani

    A Deep Geologic Repository (DGR) for Low and Intermediate Level radioactive waste has been proposed by Ontario Power Generation for the Bruce Nuclear site in Ontario, Canada. The DGR is to be construc

    May 1, 2009

  • CIM
    Selected Methods for Shaft Lining Repairs in Polish Coal Mines

    Shafts are the most important workings in the underground mines. Their technical state to a large extent determines the safety and efficiency of mining operations. However, in many cases periodically

    Aug 1, 2013